![Xilinx Zynq-7000 Getting Started Manual Download Page 23](http://html2.mh-extra.com/html/xilinx/zynq-7000/zynq-7000_getting-started-manual_3392241023.webp)
ZC702 and ZVIK Getting Started Guide
23
UG926 (v6.0) December 17, 2013
Run the BIST Application
TIP:
If any of the BIST tests fail, check the settings of the switches and jumpers as shown in
, and
. If these settings are correct and the test still fails, please contact
to review your Support options.