ML628 IBERT Getting Started Guide
17
UG806 (v1.0) May 20, 2011
Running the GTH IBERT Demonstration
8.
When the dialog appears asking to set up the core with the settings from the current
project, click
Yes
(
).
Note:
Restarting the SuperClock-2 module is not required. The Si5268 clock outputs will be
enabled and running at the correct frequency.
X-Ref Target - Figure 1-15
Figure 1-15:
Open Cable Button
UG
8
06_c1_15_041411
Open Ca
b
le B
u
tton
X-Ref Target - Figure 1-16
Figure 1-16:
IBERT V6GTH Project Settings
u
g
8
06_c1_16_041411