C.P. Bourg Document Finisher (BDFx)
Install Planning
This Install Planning guide will help you prepare for the installation
of the C.P Bourg Document Finisher (BDFx) together with:
•
Xerox DocuTech
61xx
•
Xerox DocuTech
1xx HighLight Color (HLC)
•
Xerox DocuPrint
1xx
•
Xerox iGen3
Digital Production Press
•
Xerox Nuvera
100 / 120 Digital Production System
Device Configurations
The Bourg Document Finisher components are:
•
BDFx with Conveyor and 2 Cassette Stitch Heads
•
Bourg Cover Feeder X (BCFx),
optional (not available with
iGen3)
•
Square Edge Module (SQEDG
),
optional
•
Bourg Sheet Rotator (BSR),
optional (mandatory with iGen3)
•
Hohner or Cassette Stitch Heads (2 –4 heads total),
optional
Note: The BDFx is delivered with 2 stitch heads. A third and / or
forth stitch head must be ordered and installed with the machine.
Space Requirements
The space requirements illustration provides machine footprint as
well as the overall operating and maintenance area.
In addition to the diagram below, there should be a minimum of 82
inches (2.083 mm) clearance from the floor to the nearest overhead
obstruction.
1-2
Summary of Contents for Docutech 128
Page 4: ...Table Of Contents...
Page 6: ...C P Bourg Document Finisher BDFx Customer Agreement contains the Customer Agreement form II...
Page 8: ......
Page 20: ...C P Bourg Document Finisher BDFx 2 4...
Page 24: ...C P Bourg Document Finisher BDFx 3 4...
Page 32: ...C P Bourg Document Finisher BDFx 5 4...
Page 36: ...C P Bourg Document Finisher BDFx 6 4...
Page 38: ...A...