background image

J0

Nylon Insert Lock Nut

M8

M8

M4

M5*15mm

M4*8mm

M4*15mm

M8*85mm 

M5*10mm 

M10*16mm

M10*1.5T*Φ20

M6*50mm

M4*12mm

M8*35mm

M8*16mm

M8*Φ16*1.5T

Seat Carriage Roller Cover

Seat Carriage Cover
Seat Carriage Wheel

Seat Carriage Axial

Seat Carriage Roller

Even Head Socket Screw

Cap Head Socket Screw

Phillip Head Socket Screw

Seat Carriage Stopper

Phillip Head Socket Screw

Moving Wheel

Ball Head Screw

Console Back Cover

Flat Head Phillips Screw

Adjust Pedal Pad

Left Pedal Rest
Right Pedal Rest

Left Pedal Rest Cover
Right Pedal Rest Cover

Flat Head Phillips Screw
Spacer

Right Console Tube Cover

Left Console Tube Cover

A6

2

Axial of Moving Wheel

Ball Head Screw

M4*10mm 

40*80

M8*40mm

M8

40*32mm

M4*12mm

40*80

Φ50

40*32mm

M4*12mm 

Pedal Stable Bracket

K

J9

Aluminum Rail

Chain Connecting Axial

Bearing

Φ8X156mm

PR-608ZZ(BMC)

Φ8*Φ12*2mm

Φ10*121mm

M8*2.0T*Φ16

M8

PR-608ZZ(BMC)

M8*20mm

M8*Φ16*2T

M8

M6*10mm

M5*10mm

Φ5.25*85mm

ABS

ABS

TPE

TPR

ABS

Summary of Contents for Air Rower AR-2

Page 1: ...2...

Page 2: ...e using the equipment 3 Use equipment on a flat level surface Use adjustment levelers on the bottom of equipment to help stabilize unit 4 It s recommended to place an exercise mat beneath the equipmen...

Page 3: ...A B C D E F G H K J J1 Bolt M10x16mm J2 Washer M10x1 5t J3 Bolt M6x50mm J5 Bolt M8x25mm J6 Bolt M8x16mm J7 Washer M8x1 5t J8 Pull pin J9 Screw M4x10mm J0 M8 Nylon Nut J4 Screw M4x12 7mm...

Page 4: ...L pieces accordingly to ensure you are not missing any items PLEASE BE CAUTIOUS as some components may be sharp and can cause harm if not handled correctly Always use safety measurements when assembli...

Page 5: ...ll connect to console tube when installing console CAUTION PLEASE HANDLE WITH CARE AS ELECTRICAL WIRES ARE DELICATE IF WIRES ARE HANDLED TOO AGGRESSIVELY THEY WILL DISLOCATE Once the wires are exposed...

Page 6: ...join together once attached onto forward Base A Once rejoined p and 1 screw J4 lease secure with 2 screws J9 To install Rear Base Leg D face Base Railing B face down so that the receiving device for t...

Page 7: ...de into place of Foot Pedal E1 Once placed secure with 2 J5 bolts and 2 J0 nuts NOTE You must install foot pedals before moving forward with the assembly process Should Step 5 be skipped the Pre screw...

Page 8: ...ll pin J8 locate the pre screwed bolt at the end of Forward Base A and turn clockwise until the bolt is securely fastened Align Forward Base A with Base Railing B until the pre screwed holes are align...

Page 9: ...e Leg C will be facing outward When you are ready to unfold the Xebex Rower again simply pull on PULL PIN J8 while holding onto Base Railing B This will cause Base Railing B to drop NOTE Please use a...

Page 10: ...Lever controls how much air plows into the flywheel housing Higher damper setting allows more resistance Lower damper setting allows less resistance Foot Height Adjuster Push down to adjust the posit...

Page 11: ...C5 C3 A62 K J0...

Page 12: ...ABS Chain Cover Right FC 2016 M4 12mm 31 8 3T M6 45mm M6 Axial of Pulley Front Main Frame Front Cap Axial of Pulley Back 10 79 8mm M6 10mm M6 30mm 12 7 76mm M4 10 1T M4 10mm 21 5 12mm M10 16mm 1 2 2...

Page 13: ...w Moving Wheel Ball Head Screw Console Back Cover Flat Head Phillips Screw Adjust Pedal Pad Left Pedal Rest Right Pedal Rest Left Pedal Rest Cover Right Pedal Rest Cover Flat Head Phillips Screw Space...

Reviews: