background image

 

DO NOT RETURN TO RETAILER YOU PURCHASED AT. 

CONTACT XDP FOR PARTS AND SUPPORT AT 1.866.884.0535 or [email protected] 

28 

STEP 16 - Slide assembly (continued) 

  Fit Y1 in between X1-N and A6; Secure using Y1, Z7, Z6 and Z3, Z5 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: 

1.Do not over-tighten the nuts and bolts at every step. 

2.Do not snap in the cover of plastic cap until you have finished the assembly of 

each step and went back to tighten all of the nuts and bolts. 

 

 

 

A6 

Y1 

A4 

A4 

X1-N 

 

Z7 

Z6 

Z3 

Z3 

Z5 

Z5 

Summary of Contents for 86150

Page 1: ...LDREN TO JUMP ON OR CLIMB UP ON THIS SET S TOP BAR For warranty details and registration see the back page of this manual FOLLOW ALLASSEMBLY INSTRUCTIONS AS WRITTEN IN THIS MANUAL Please retain sales...

Page 2: ...re using the parts and hardware lists in the following pages If any parts are missing do not return to the store Please call customer service toll free number listed on the cover page for assistance S...

Page 3: ...rface e g asphalt concrete packed earth tile or brick floor Please refer to the CONSUMER PRODUCT SAFETY COMMISSION S OUTDOOR HOME PLAYGROUND SAFETY HANDBOOK for detailed guidelines to prevent injuries...

Page 4: ...ALWAYS dress children appropriately for proper play e g wear well fitted rubber sole shoes and remove loose or sharp items such as jewelry hair accessories scarves which may become entangled in the eq...

Page 5: ...immediately properly store the set or restrict access by users until the condition is resolved Verify that the chains are secured at both ends and tightened so that there is no loose chain hanging th...

Page 6: ...e that the swing set is located on level ground Twist the corkscrew anchor into the ground until only the end with the hook is above the ground and next to the leg Insert the hook into the bottom open...

Page 7: ...ground clearance between the bottom of the suspended plays and the playing or ground surface must be 8 inches You must maintain a minimum of 8 inches of ground clearance WARNING Please properly anchor...

Page 8: ...moving parts including swing seats and chains for wear rust or other deterioration Replace as needed Rake and check depth of loose fill protective surfacing materials to prevent compaction and to mai...

Page 9: ...D Please prepare the following tools prior to assembling this equipment SpecialSocketWrench TapeMeasure included Notincluded Hammer Wrench If youintendtoinstallanchor thisis needed Included Wrench Big...

Page 10: ...FOAM 6 A5 CROSS BAR WITH TWO HOLES 2 A6 CROSS BAR WITH FOUR HOLES 1 A7 WIND SCREEN 3 A8 SLEEVE SINGLE COLOR 6 Hardware used for main frame assembly B1 BOLT 5 16 x2 1 2 63mm 10 B2 BOLT 5 16 x2 5 8 68mm...

Page 11: ...SUPPORT 2 M1 TUBE CAP PRE ASSEMBLED 2 M2 SMALL NYLON BEARING PRE ASSEMBLED 2 M3 LARGE NYLON BEARING PRE ASSEMBLED 4 M4 GLIDE SEAT 2 M5 FOOTREST 2 Hardware used for glide ride assembly N1 BOLT 1 4 1 5...

Page 12: ...rdware used for swing seat assembly Part list for flying saucer assembly R1 PVC COVERED CHAIN PRE ASSEMBLED 4 R2A EYE BOLT WITH ATTACHMENT BOLT PRE ASSEMBLED 2 R2B EYE BOLT WITH ATTACHMENT BOLT PRE AS...

Page 13: ...T WITH OPENING 1 X2 N SLIDE SUPPORT 1 X3 N SLIDE LEG TUBE 2 X4 N SLIDE TOP SUPPORT BAR 1 X5 N SLIDE FRONT SUPPORT 1 X6 SLIDE LADDER STEPS 2 Y2 SLIDE 1 Hardware used for slide assembly Y1 PLASTIC CONNE...

Page 14: ...ovide clearance for wires tree limbs and other possible hazards Use the swing set in a well lighted area Artificial illumination may be required for shady areas Secure the swing set against unauthoriz...

Page 15: ...ssemble the top bar frame of the swing set Connect A1 A2 and A3 secure with B1 B5 B4 and B3 as shown below Note All round holes should be facing up and concave holes facing down STEP 2 Prepare the sle...

Page 16: ...EP 3 Prepare the wind screen of the support legs Connect A7 to A4 Repeat the above step for another two A4 legs like this STEP 4 Assemble the support legs of swing set Connect A1 to A4 and secure usin...

Page 17: ...tion com 16 STEP 5 Attach the cross bar to the support legs Connect A4 to A5 and secure using B2 B6 B4 and B3 as shown below Repeat the above step for the right side of the swing set A2 and A5 Attach...

Page 18: ...DO NOT RETURN TO RETAILER YOU PURCHASED AT CONTACT XDP FOR PARTS AND SUPPORT AT 1 866 884 0535 or service xdp recreation com 17...

Page 19: ...AT 1 866 884 0535 or service xdp recreation com 18 STEP 6 Glide Ride assembly Attach L4 and L3 to A1 using N3R L5 and N7 as shown Use special socket wrench and screw driver to tighten N3R and N7 N3R U...

Page 20: ...T 1 866 884 0535 or service xdp recreation com 19 STEP 7 Glide ride assembly continued Attach L1 N to L3 on both sides and secure with N2R and N10 Insert L1 N straight end into M5 and secure with N4 a...

Page 21: ...ARTS AND SUPPORT AT 1 866 884 0535 or service xdp recreation com 20 STEP 8 Glide ride assembly continued Attach L2 N to L1 N on both sides and secure with N5 M3 N11 and N8 N5 Round holes face down Con...

Page 22: ...ER YOU PURCHASED AT CONTACT XDP FOR PARTS AND SUPPORT AT 1 866 884 0535 or service xdp recreation com 21 STEP 9 Glide ride assembly continued Attach M4 to L2 N and secure with N1 N6 and N9 N6 M4 L2 N...

Page 23: ...p recreation com 22 STEP 10 Swing Seat assembly Connect swing seat to the chains by inserting J3 through K1 and secure with J7 J9 and J6 as shown in Diagram B Repeat the above steps to assemble A3 in...

Page 24: ...UPPORT AT 1 866 884 0535 or service xdp recreation com 23 STEP 11 Flying Saucer Assembly Slide the smaller ends of R3 tubes into the pockets of Flying Saucer R4 Connect the four tubes together Align t...

Page 25: ...er to the Swing Set Frame Connect the chain R1 to the flying saucer by inserting R2B and securing with F2 and F1 as shown in Diagram A Connect flying saucer to the top bar by inserting R2A through A1...

Page 26: ...nsert X5 N into the base of Y2 Secure using Z7 Z6 and Z4 Attach X4 N to Y2 Note Make sure that the bolt holes face up NOTE 1 Do not over tighten the nuts and bolts at every step 2 Do not snap in the c...

Page 27: ...Z1 Z6 and Z4 Attach X3 N to X1 N and X2 N Align holes and hold in position NOTE 1 Do not over tighten the nuts and bolts at every step 2 Do not snap in the cover of plastic cap until you have finished...

Page 28: ...nd Z5 as shown in the enlarged diagram Secure the two sides of the slide using Z2 Z6 and Z4 in the sequence shown in the diagram NOTE 1 Do not over tighten the nuts and bolts at every step 2 Do not sn...

Page 29: ...EP 16 Slide assembly continued Fit Y1 in between X1 N and A6 Secure using Y1 Z7 Z6 and Z3 Z5 NOTE 1 Do not over tighten the nuts and bolts at every step 2 Do not snap in the cover of plastic cap until...

Page 30: ...n com 29 Congratulations You have now completed the swing set assembly Please make sure to thoroughly check all parts and hardware to make sure all bolts and nuts are well secured before using the pla...

Page 31: ...warranty is extended only to the original purchaser with a receipt and is not transferrable What will XDP Recreation do They will provide a replacement part at no charge for any part found defective...

Reviews: