71
For the use and maintenance of the watermaker, please refer to its
instruction guide.
The boat may optionally be fitted with a watermaker located in front of
the berth in the aft port cabin.
OPERATION
The watermaker operates when the generator is powered up.
Open the sea water inlet valve (accessed via the floor in front of the
berth in the aft port cabin).
To switch the watermaker on:
- Check that the relevant automatic breaker located on the protection
panel in the cupboard to the left of the companionway in the starboard
float is set to “ON”.
- Switch the watermaker on using its switch on the side of the
watermaker.
The watermaker circuit has a 3-way valve used to supply the port or
starboard tank with fresh water. This valve is located in front of the
watermaker.
Check the level of fresh water in the tanks when the watermaker is
working.
The watermaker has an automatic rinse function at the end of the
cycle.
Make sure that the water unit is operating when using the watermaker.
WaTER SySTEmS
06
REcommENDaTIoN
The watermaker shall be used exclusively in clear waters.
06.6
Watermaker (optional)
Summary of Contents for Excess15
Page 1: ...USER GUIDE...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 30: ...28 DAVITS DAVITS...
Page 32: ......
Page 33: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 31 03...
Page 42: ...40 RUNNING RIGGING JIB CIRCUIT 1 Jib sheet 2 Jib halyard 3 Jib furling line 1 3 2...
Page 46: ......
Page 48: ...46 SALOON LIGHTINGS ELECTRICAL PANEL Saloon benchseat fixation...
Page 52: ......
Page 60: ......
Page 74: ......
Page 82: ...80 ELECTRONICS AUTOMATIC PILOT RAM AUTOMATIC PILOT COMPASS LOCH SOUNDER DEPTH FINDER...
Page 88: ......
Page 89: ...MOTORIZATION 8 1 Engines 8 2 Fuel 8 3 Propellers Anodes 8 4 Dash board 87 08...
Page 92: ...90 FUEL FUEL FILTER FUEL GAUGE TOUCH SCREEN FUEL VALVE...
Page 94: ...92...
Page 96: ......
Page 97: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 95 09...
Page 100: ......
Page 101: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 99 10...
Page 102: ...100 DIMENSIONS FOR CRANE LIFTING 3200 mm 9670 mm...
Page 104: ......
Page 106: ...104...
Page 116: ......
Page 117: ...MAINTENANCE 12 1 Maintenance schedule 115 12...
Page 120: ......
Page 122: ......
Page 123: ......
Page 124: ......