84
SUmmaRy FoR THE 110 V - 220 V comPoNENTS
GENERATOR
Force 7/11 Kva in 220 V
100% of its charge in 220 V - 50 Hz
Force 9/13,5 Kva in 110 V
100% of its charge in 110 V - 60 Hz
SHORE POWER SOCKETS
On-board shore power socket 220 V - 50 Hz
32 A simple shore power socket
Starboard transom connection
Air Conditioning shore power socket 220 V - 50 Hz
32 A simple shore power socket
Starboard transom connection
On-board shore power socket 110 V - 60 Hz (US Version)
50 A simple shore power socket
Starboard transom connection
Air Conditioning shore power socket 110 V - 60 Hz (US Version) 50 A simple shore power socket
Starboard transom connection
ELECTRIC DISTRIBUTION
Right selector
Air conditioning supplied by generator or shore power
Left selector
On-board supplied by generator or shore power
CHARGE
1 x 220 V / 12 V - 60 A charger
Recharge of the service bank by generator or shore power
1 x 220 V / 12 V - 40 A optional charger
Engine batteries charger supplied by the generator or the shore
1 x 220 V / 12 V - 25 A optional charger
Generator batteries charger supplied by the shore power
Summary of Contents for Excess15
Page 1: ...USER GUIDE...
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 16: ......
Page 30: ...28 DAVITS DAVITS...
Page 32: ......
Page 33: ...RIGGING SAILS 3 1 Sailing 3 2 Standing rigging 3 3 Running rigging 3 4 Sails 31 03...
Page 42: ...40 RUNNING RIGGING JIB CIRCUIT 1 Jib sheet 2 Jib halyard 3 Jib furling line 1 3 2...
Page 46: ......
Page 48: ...46 SALOON LIGHTINGS ELECTRICAL PANEL Saloon benchseat fixation...
Page 52: ......
Page 60: ......
Page 74: ......
Page 82: ...80 ELECTRONICS AUTOMATIC PILOT RAM AUTOMATIC PILOT COMPASS LOCH SOUNDER DEPTH FINDER...
Page 88: ......
Page 89: ...MOTORIZATION 8 1 Engines 8 2 Fuel 8 3 Propellers Anodes 8 4 Dash board 87 08...
Page 92: ...90 FUEL FUEL FILTER FUEL GAUGE TOUCH SCREEN FUEL VALVE...
Page 94: ...92...
Page 96: ......
Page 97: ...WINTER STORAGE 9 1 Laying up 9 2 Protection 95 09...
Page 100: ......
Page 101: ...HANDLING 10 1 Preparation 10 2 Crane lifting 10 3 Mast stepping Mast unstepping 99 10...
Page 102: ...100 DIMENSIONS FOR CRANE LIFTING 3200 mm 9670 mm...
Page 104: ......
Page 106: ...104...
Page 116: ......
Page 117: ...MAINTENANCE 12 1 Maintenance schedule 115 12...
Page 120: ......
Page 122: ......
Page 123: ......
Page 124: ......