![Xantrex PV225S-480-P Operation And Maintenance Manual Download Page 74](http://html1.mh-extra.com/html/xantrex/pv225s-480-p/pv225s-480-p_operation-and-maintenance-manual_3311811074.webp)
Operation
2–34
152607
5. Fill out the
Operational Configurations
Information in the form shown in
Figure 2-21 through Figure 2-23. This section has four sub-menu pages to
cover the following parameters.
a) Fill out Operational Limits Information requested.
b) Click on the PV Sub-menu to continue.
c) Fill out PV Information requested.
d) Click on the Power Tracker Sub-menu to continue.
Figure 2-21
Operational Configuration Screen - Limits
Fill out all the required
information on this
form.
Form Tab
Sub-menu
Figure 2-22
Operational Configuration Screen - PV
Fill out all the required
information on this
form.
Form Tab
Sub-menu
Summary of Contents for PV225S-480-P
Page 1: ...PV225S 225 kW Grid Tied Photovoltaic Inverter PV225S 480 P Operation and Maintenance Manual...
Page 2: ......
Page 3: ...PV225S 225 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual...
Page 8: ...vi...
Page 14: ...xii...
Page 22: ...xx...
Page 78: ...2 38...
Page 79: ...Computer Communications with the PV225S 152607 2 39...
Page 80: ...Operation 2 40 152607...
Page 88: ...3 8...
Page 102: ...4 14...
Page 110: ...5 8...
Page 115: ...Appendix A Schematics 152607 A 5 Figure A 1 Electrical Diagram sample...
Page 122: ...WA 4...
Page 125: ......