Unloading
152315 Rev C
3–3
Moving the PV100S
To move the PV100S while it is still inside the shipping crates:
1. Place the forks of the forklift below the shipping crate at the points specified
on the shipping crate.
2. Lift the main inverter and the AC Interface Enclosure and Transformer
Enclosure from beneath their shipping crates.
Unpacking the PV100S
To unpack the main inverter and the AC Interface Enclosure and
transformer assembly from their shipping crates:
1. Using a claw hammer or pry bar, remove the crate’s wood top and side panels.
2. Remove the main inverter’s anchor hardware that attaches it to the shipping
pallet.
3. Remove the AC Interface Enclosure and transformer assembly anchor
hardware that attaches them to their shipping pallet.
c
CAUTION: Equipment Damage
To move the PV100S, use a forklift that has a sufficient lift capacity and has a 26" fork
span.
Figure 3-1
Moving the crated PV100S
Summary of Contents for PV100S-480
Page 2: ......
Page 3: ...PV100S 100 kW Grid Tied Photovoltaic Inverter Planning and Installation Manual...
Page 8: ...vi...
Page 14: ...xii...
Page 18: ...xvi...
Page 77: ...A Schematics Appendix A contains useful schematics to aid with installation...
Page 78: ...Schematics A 2 152315 Rev C This page intentionally left blank...
Page 79: ...Appendix A Schematics 152315 Rev C A 3 Figure A 1 Electrical Diagram sample...
Page 86: ...Schematics Appendix A A 10 152315 Rev C This page was intentionally left blank...
Page 89: ......