Operation
2–24
152379 Rev C
Energize Procedure (Startup)
To start up the PV100S:
1. Remove any lockout devices from the utility connection circuit breaker and
PV disconnect switch.
2. Close the utility connection circuit breaker.
3. Close the AC Disconnect Switch.
4. Close the DC Disconnect Switch.
5. Turn the O
N
/O
FF
switch to the O
N
position.
After a 15 second initialization period, the PV100S will automatically transition
to ‘Waking Up’, given the PV voltage is greater than the PV V Start set point.
De-Energize/Isolation Procedure (Shutdown)
The following procedure should be followed to de-energize the PV100S for
maintenance.
To isolate the PV100S:
1. Turn the
ON
/
OFF
switch to the
OFF
position.
2. Open the DC interface disconnect switch.
3. Open the AC interface disconnect switch.
4. Open the utility connection circuit breaker.
5. Install lockout devices on the utility connection circuit breaker and DC
disconnect switch.
WARNING
The terminals of the DC input may be energized if the PV arrays are energized. In
addition, allow 5 minutes for all capacitors within the main enclosure to discharge after
disconnecting the PV100S from AC and DC sources.
Summary of Contents for PV100S-208
Page 2: ......
Page 3: ...s PV100S 100 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual...
Page 8: ...vi...
Page 14: ...xii...
Page 22: ...xx...
Page 78: ...2 38...
Page 86: ...3 8...
Page 104: ...5 8...
Page 109: ...Appendix A Schematics 152379 Rev C A 5 Figure A 1 Electrical Diagram sample...
Page 116: ...Schematics Appendix A A 12 152379 Rev C This page intentionally left blank...
Page 120: ...Warranty and Return WA 4 152379 Rev C...
Page 123: ......