Setting Changes
975-0059-01-01 Rev A
3–5
Automatic Generator Equalize Charging
If the inverters are set to automatically charge the batteries using the generator, the
equalize process will begin during the next, automatically started, generator run
period. When
the equalizing process has completed, the generator automatically
stops and the cursor returns to the OFF position in the 01B EQ C
HARGE
menu
item on the generator-controlling inverter. The non-generator-controlling inverter
must be set from EQ to OFF from the 01B EQ C
HARGE
menu item or it will start
another equalize charge the next time the generator is started.
Manual Equalize Charging
If the batteries were equalized using a manually started generator or from the
utility grid, the F
LOAT
LED illuminates, indicating the equalization process is
complete. Set the cursor to OFF on both inverters under the 01B EQ C
HARGE
menu item when the equalization process is complete.
Important:
If using multiple battery temperature sensors (BTS) ensure they are all
connected to the same location (battery).
Summary of Contents for power Inverter Stacking
Page 2: ......
Page 3: ...Inverter Stacking Control Series ISC S Cable Installation Guide...
Page 8: ...vi...
Page 10: ...viii...
Page 12: ...x...
Page 36: ...2 18...
Page 42: ...3 6...
Page 48: ...IX 2...
Page 49: ......