Installation
2–8
152602
To make PV Array #1 and GT100E #1 connections:
1. Route the PV Array #1 cables through the access panel and connect
the cables to PV ARRAY #1 PV(+) and PV(-) terminals, see Figure 2-
5.
2. Route the GT100E #1 cables through the access panel and connect the
cables to GT100E #1 PV(+) UNIT and PV(-) terminals, see Figure 2-
5.
3. Route the PV Array #1 ground cable through the access panel and
connect the cable to PV ARRAY #1 GND terminal, see Figure 2-5.
Figure 2-5
PV Array #1 and GT100E #1 Connections
Combiner Box
PV ARRAY #1
GND Terminal
Combiner Box
PV ARRAY #1
PV (+) Terminal
Combiner Box
PV ARRAY #1
PV (-) Terminal
Combiner Box
GT100E #1
PV (+) Terminal
Combiner Box
GT100E #1
PV (-) Terminal
Summary of Contents for GT100E
Page 1: ...GT100E MS Combiner Box for Master Slave Configuration Owner s Manual ...
Page 2: ......
Page 3: ...GT100E MS Combiner Box for Master Slave Configuration Owner s Manual ...
Page 8: ...vi ...
Page 10: ...viii ...
Page 12: ...x ...
Page 38: ...WA 4 ...
Page 39: ......