background image

 

 
 
 
 
 
 

vipPAQ

 

 
 
 

Hardware Installation 

Manual 

 
 

 

 
 
 
 
 
 
 
 
 
 
 

Edition 2c 
May 2008 

 

Summary of Contents for vipPAQ

Page 1: ...vipPAQ Hardware Installation Manual Edition 2c May 2008 ...

Page 2: ...yet 2 Required Tools Allan keys Set 3mm 6mm 8mm with balls at the end 3 Delivered Items Name Units Mounting bar 1 Operating lever with retainer 1 Mounting plate 2 0 rings to hold cables 5 Controller 1 Measuring head s 1 to 4 Measuring head retainer s Number of measuring heads 1 to 4 Serial cable controller measuring head Number of measuring heads 1 to 4 Data cable controller PC 1 Power cable 1 Dis...

Page 3: ...llowed 1 Measure the exact distance 0 5 mm between the foreseen mounting areas 2 Subtract 82mm 3 23 from the measured distance 3 Precisely cut the bar to that length 4 Insert and clew bolt and roll according to the below drawing Use Loctite 648 or similar to clew the parts This graph shows one end of the bar The other end needs to be equal 3 ...

Page 4: ...plates 3 Mount the 2 vipPAQ mounting plates at both sides of the mounting bar 4 Put this assembled system to the guide roller and mark the upper hole and the outside edge of the mounting plates on the foreseen mounting area 5 Take the assembled system from the guide roller 6 Verify the marked mounting plate position with the foils delivered with the vipPAQ system see also figure 1 on next page and...

Page 5: ...vipPAQ Hardware Installation Manual Ed 2c Figure 1 5 ...

Page 6: ...al Ed 2c 6 Mount the Mounting Plates Two M10 screws are used to fix each mounting plate in the correct position see image below Do not fully tighten up the screws because the position will later be adjusted by using distance holders 6 ...

Page 7: ...f retainers is depending on amount of measurement heads but at least 2 need to be inserted for the installation 2 Insert the operating lever retainer in the upper rail slot of the measuring on the front wide side Operating lever retainer 3 Insert the mounting bar with all the retainers inserted in the lower parts of the mounting plate bushings Upper opening 7 ...

Page 8: ...ce 5 The distance between the mounting bar and the mounting plates must be equal on both sides The sideward movement of the bat needs also to be minimal and may not be too tight To adjust the mounting bar it needs to be taken away and the screw in the hole of the mounting plates needs to be adjusted on one side 8 ...

Page 9: ...on and insert the measuring bolts both sides The mounting bar is in the correct position when the measuring bolts and distance holders touch the roller both sides 3 Tighten up the lower mounting plate screws both sides 4 Remove the measuring bolts and distance holders tilt the tilting unit upwards and tighten up the upper mounting plate screws both sides 9 ...

Page 10: ...crew beside the position screw red arrow 3 Connect the appropriate cable to the measuring heads and controller unit 4 Lay the cables to the measuring heads in the rail slot Fasten the cables with the enclosed O rings approximately all 10 cm 4 inches Upon this please make sure the cable length at the head is enough long to move the heads later on 5 Connect the controller unit to the PC s USB interf...

Reviews: