![X-Rite Ci61 User Manual Download Page 26](http://html1.mh-extra.com/html/x-rite/ci61/ci61_user-manual_3110984026.webp)
C i 6 1 S P E C T R O P H O T O M E T E R
24
2.
Tap the
Select
button and then tap the
Left
navigation button to move the highlight to the
select option screen.
3.
Use the
Up
or
Down
navigation buttons to choose Delete This Project or Delete All Samples.
Tap the
Select
button to choose the option.
4.
Tap the
Right
navigation button and highlight the Checkmark icon
in the Progress
Column.
5.
Tap the
Select
button to delete the selected option.
Locking a Project
After a project is created it can be locked to help prevent any inadvertently deleting of stored
samples.
To lock a project:
1.
Select a project as previously explained and then tap the
Right
navigation button. Highlight
the Edit
icon in the Progress Column.
2.
Tap the
Select
button and then tap the
Left
navigation button to move the highlight to the
select option screen.
3.
Use the
Up
or
Down
navigation buttons to choose the Lock Project option. Tap the
Select
button to choose the option.
4.
Tap the
Right
navigation button and highlight the Checkmark icon
in the Progress
Column.
5.
Tap the
Select
button to lock the project.
Unlocking a Project
Projects can be unlocked by selecting the Unlock Project option after the project is locked.
Editing Project Name
To rename a project:
1.
Select the project (if not already selected) that you want to rename and move the highlight to
the Progress Column.
2.
Highlight the Edit icon
and tap the
Select
button to view the select option screen.
3.
Select the Edit icon
and tap the
Select
button to view the Enter Project Name screen.
4.
Tap the
Left
navigation button to move the highlight to the Enter Project Name screen.