![wtw WTW Turb 430 IR Operation Manual Download Page 8](http://html1.mh-extra.com/html/wtw/wtw-turb-430-ir/wtw-turb-430-ir_operation-manual_1000703008.webp)
Initial commissioning
Turb 430 IR/T
8
ba75507d04
11/2018
Initial commissioning
Switching on the meter
Press the
<ON/OFF>
key.
Setting the language
The English language is set on delivery. Set a different language as
follows:
Setting the date and
time
The date and time are set in the menu,
Configuration
/
System
/
Continue ...
/
Date/time
.
Operation
Inserting a cell
To be able to insert cells in the Turb 430 IR/T, the cell shaft has to be
prepared to take in a cell.
i
Insert standard
1000 FNU/NTU
i
Press and hold <START>
i
Align sample
Turbidity \ Calibration
The
i
indicates
info texts, e.g.
messages, notes or
instructions
1
Open the
Configuration
menu with the
<MENU>
key.
2
Open the
Configuration
/
System
/
Language
menu with the
<
> <
>
and
<START/ENTER>
keys.
3
Select the required language with the
<
> <
>
keys and
confirm with
<START/ENTER>
.
4
Quit the menu with the
<M>
key.
1
Push the dust cover (1) upward.
The cell shaft for 28 mm cells is open.