background image

Page  2 of  12 

 

WIM-DA-002_B 

 

Table of Contents 

                                                                                                                                     

 

Page No. 

 

1.0  INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  3 

 

 

2.0  SPECIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 

 

3.0  INSPECTION  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  5 

3.1 

Preparation  

3.2 

Brake rotor disc face run out inspection 

3.3 

Shaft bearing endplay inspection 

 

4.0  INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 

4.1 

Preparation  

4.2 

Brake disc expansion 

4.3 

Brake disc installation 

4.4 

Caliper installation  

4.5 

Drawing and parts list reference 

4.6 

Caliper clearance adjustment 

4.7 

Air lines 

 

5.0  OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 

6.1 

Clearance inspection 

6.2 

Burnish friction linings 

6.3 

Disc warm up in cold weather 

6.4 

Air applied/spring release actuator 

 

6.0  MAINTENANCE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 

7.1 

Air applied caliper brake 

7.2 

Clearance inspection 

7.3 

Clearance adjustment 

7.4 

Friction lining alignment 

7.5 

Adjust friction alignment (balancing link) 

7.6 

Periodic inspection 

7.7 

Friction lining replacement 

7.8 

Remove rivets/ hardware 

7.9 

Install shoe assembly 

 

7.0  DISASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 

 

8.0  ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 

 

9.0  BOLT TORQUE VALUES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 

 

10.0 ACTUATOR ASSEMBLY - AIR APPLIED BRAKE   . . . . . . . . . . . . ..10 

 

11.0 AIR APPLIED BRAKE ASSEMBLY. . . . . . . . . . . . . . . . . . . . . . . . . . .11 

 

12.0 STORAGE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 

 

 

 

Summary of Contents for WDA-26

Page 1: ...Caliper Brake Ductile Iron Version Installation Maintenance Manual WPT Power Corporation 1600 Fisher Road Wichita Falls TX 76305 P O Box 8148 Wichita Falls TX 76307 Ph 940 761 1971 www WPTpower com...

Page 2: ...7 Air lines 5 0 OPERATION 6 6 1 Clearance inspection 6 2 Burnish friction linings 6 3 Disc warm up in cold weather 6 4 Air applied spring release actuator 6 0 MAINTENANCE 7 7 1 Air applied caliper br...

Page 3: ...injury insure that adequate lifting devices and hand tools are available WARNING Read these instructions thoroughly and review until you fully understand all warning and hazards before proceeding with...

Page 4: ...150 860 710 710 630 570 NOTE All fasteners must be SAE Grade 8 or better 2 2 When running at elevated temperatures allow adequate mounting holes clearance for disc to expand and contract during operat...

Page 5: ...the outside diameter of the brake rotor disc see sketch below Rotate the disc 360 degrees The indicator reading should not exceed 0 015 inches 0 38 mm T I R 3 3 Check Brake Rotor Disc Concentricity M...

Page 6: ...ted by the brake caliper 4 5 Refer to caliper brake illustrations and parts lists in the back of this manual pages 10 and 11 4 6 For initial adjustment of caliper brake for adjustment see section 6 0...

Page 7: ...s must be replaced before hardware contact the disc rotor 6 6 Replace friction lining by removing cotter pins nuts and shoe rod holding shoe assembly to the lever Remove bolts holding outer bearing an...

Page 8: ...r bearing to the shoe assembly 7 5 Remove cotter pins nuts and saddle rod holding levers to the caliper brake 7 6 Remove tie rod nuts and lock washers from tie rods 7 7 Remove saddles and spacers from...

Page 9: ...CAP SCREWS Grade 8 BOLT SIZE As Received Lubricated IN INCHES LB FT LB IN Nm LB FT LB IN Nm 1 4 8 100 11 6 80 9 5 16 17 200 23 13 160 18 3 8 30 360 41 24 288 32 7 16 48 570 64 38 456 51 1 2 83 990 112...

Page 10: ...of 12 WIM DA 002_B 10 0 ACTUATOR ASSEMBLY DRAWING AND PARTS LIST Item Description Item Description 1 End Cap 7 O Ring 2 Spring 8 HHCS 3 Guide Pin 9 Nut 4 Nut 10 Diaphragm 5 Plate Diaphragm 11 Plug 6...

Page 11: ...COTTER 24 PIN CLEVIS 3 BALANCING LINK 14 SHCS 25 PIN 4 WASHER FLAT 15 SADDLE ROD 26 PIN COTTER 5 SHCS 16 WASHER FLAT 27 SPACER 6 BALANCING LINK 17 NUT 28 SADDLE 7 KIT RELINE 18 PIN COTTER 29 FOOT 8 SH...

Page 12: ...ained as follows o No exposure to rainwater o Temperatures 32F 0C to 110F 43C o Below 50 average humidity o Average sunlight Hazards that require addition protection o Dust and debris o Oil water salt...

Reviews: