U.S. patents and Foreign patents are pending on this product.
© 2020 Worthington Industries Inc. 1/20
INSTALLATION INSTRUCTIONS
MONITOR INSTALL
MONITOR INSTALL - ON TANK
© 2020 Worthington Industries Inc. 10/20
NOTES: 1. When monitoring multiple tanks that are connected (2x420s, 3x420s etc.), it is important to connect the monitor to the tank that’s showing the lowest level. If they’re equal, you should monitor the
tank with the regulator. 2. Make sure gauge is screwed on and fastened properly. Ensure that the gauge is clean and free of dirt and debris.
INSERT
1
SLIDE
2
SNAP
3
ROUTE
4
INSERT
1
SLIDE
2
SNAP
3
ROUTE
4
PLACE
1
INSERT
2
SECURE
3
ROUTE
4
LID INSTALL