Worcester GREENSTAR PLUS Operating Instructions Manual Download Page 8

STARTING AND STOPPING THE HYBRID SYSTEM

6 720 803 688 (2012/11)

8

You can check which of the following control modes the contractor has 
set for you in the Info menu (

technical documentation FW200) on the 

FW200 weather-compensated controller.

CO2-optimised

With CO

2

-optimised mode, the system control decides when 

operating the heat pump or boiler results in the greatest CO

2

 

reduction.

Cost-optimised

With the cost-optimised mode, the system control decides on the 
basis of current energy prices. Rising gas prices result in longer 
operation of the heat pump, whilst rising electricity prices result in 
longer operation of the boiler.

Changeover temperature

With outside temperature-dependent mode, the boiler starts 
operating from a defined outside temperature.

CO2:cost mix

Mixed mode comprising environmental factors and costs. 
Environmental aspects and financial aspects are both taken into 
account.

4.5.2

INSTALLER SETTINGS: HYBRID MENU

The following parameters must be set by the installer:

Control modes for hybrid systems

:

CO2-optimised

Cost-optimised

Changeover temperature

CO2:cost mix

4.5.3

MAIN MENU: ENERGY:PRICE RATIO

This menu option is only available if the 

control strategy

 has been set to 

cost-optimised

 or 

CO2-cost-Mix

 at contractor level.

Operation

Display

▶ Open  flap. 

The standard display continues to 
be shown.

Calling up the main menu:

Press The 

MAIN MENU

 is 

displayed.

Turn ▶ Highlight 

the 

Hybrid

 

menu option.

Press ▶ Confirm 

the 

selected 

Hybrid

 menu option. 

The 

Hybrid

 menu is 

displayed.

Turn ▶ Highlight 

the 

Energy:price ratio

 menu 

option.

Press ▶ Confirm 

the 

selected 

Energy:price ratio

 menu 

option. 

Turn 

▶ Set the required value.

Setting range: 0.0 to 19.9
Factory setting: 3.3
(see table 3, page 11)

Press 

▶ Call up the next menu up.

-or-

Turn ▶ Highlight 

the 

Back

 menu option.

Press ▶ Confirm 

the 

Back

 menu option.

The next menu up is displayed.

Table 2 Setting the energy price ratio Electricity/fossil fuel

6720803688-04.1Wo

OUTSIDE TEMPERATURE 9

 

C

15

18

12

h

9

21

24

h

3

6

Room temperature

23.5

09:43

Tuesday

C

menu

6720803688-05.1Wo

MAIN MENU

15

18

12

h

9

21

24

h

3

6

< Back

Holiday

Heating

6720803688-06.1Wo

MAIN MENU

15

18

12

h

9

21

24

h

3

6

Domestic hot water
General settings

Heating

6720803688-07.1Wo

HYBRID SETTINGS

15

18

12

h

9

21

24

h

3

6

Energy :price ratio

                                                     3.3

6720803688-08.1Wo

HYBRID SETTINGS

15

18

12

h

9

21

24

h

3

6

Energy :price ratio
                                                     3.3

Summary of Contents for GREENSTAR PLUS

Page 1: ...NSTRUCTIONS FOR THE USER HYBRID SYSTEM WITH AIR TO WATER HEAT PUMP GREENSTAR PLUS HYBRID 6720803687 00 1Wo FOR COMBINATION WITH WORCESTER APPLIANCES THAT HAVE A CENTRAL HEATING OUTPUT UP TO 28kW 6 720...

Page 2: ...liance 3 2 1 Designated use 3 2 2 EU Declaration of Conformity 3 2 3 Data plate 4 2 4 General information on heat production 4 2 5 Overview of components 5 2 5 1 Greenstar plus hybrid manager internal...

Page 3: ...nstalled by a competent person Modification for any other use is forbidden Never close the outlets of any safety valves COMMISSIONING Thehybridsystemandthecomponentsmayonlybecommissionedby a competent...

Page 4: ...echnologies in one system and thereby offersthe opportunity to use either heat source optimally at any time Users can decide for themselves whether the emphasis should be on primary energy consumption...

Page 5: ...nager 1 Refrigerant lines for the refrigerant R410A 2 Casing 3 Water pipe connections 2 5 2 GREENSTAR PLUS EXTERNAL UNIT Fig 3 Main components and casing of external unit 4 Top casing panel 5 Service...

Page 6: ...regulated by means of the weather compensated FW200 programming unit 9 12h 15 18 21 24h 3 6 6 720 613 572 01 1O 3 3 4 1 menu info 1 2 3 5 6 7 8 4 Keyboards 1 Turning the selector in direction Selects...

Page 7: ...e heating circuit to now Activate DHW heating immediately The DHW cylinder is heatedto the requiredtemperature for 60minutes or with combi boilers comfort mode is activated for 30 minutes If the ECO b...

Page 8: ...erature CO2 cost mix 4 5 3 MAIN MENU ENERGY PRICE RATIO Thismenuoptionisonlyavailableifthecontrolstrategyhasbeensetto cost optimised or CO2 cost Mix at contractor level Operation Display Open flap The...

Page 9: ...NTENANCE So that gas consumption and environmental impact can be kept as low as possible for as long as possible we recommend that you take out an inspection and maintenance contract with an authorise...

Page 10: ...nst faulty materials or workmanship for a period of two years from the date of installation subject to the following terms and conditions During the period of this guarantee any components of the appl...

Page 11: ...a large proportion of the energy they deliver fromtheenvironment Thisportionofenergyisnotdescribedas supplied energy as it is free of charge Were the efficiency under these conditionstobecalculated i...

Page 12: ...Worcester Bosch Group is a brand name of Bosch Thermotechnology Ltd worcester bosch co uk 6 720 803 688 2012 11 WORCESTER BOSCH GROUP TECHNICAL SUPPORT 0844 892 3366 APPOINTMENTS 0844 892 3000 SPARES...

Reviews: