INSTALLATION & SERVICING INSTRUCTIONS
17
UNPACKING THE BOILER
6-720-611-730b (12.05)
IMPORTANT: All the previous Pre-Installation sections must be read and
requirements met before starting boiler or flue installation.
Take care not to damage the boiler panels or
the floor and note that the boiler may contain
some water due to factory testing.
Unpacking:
1 Undo the ties securing the carton to the pallet
If a sharp implement is used, care must be taken
not to pierce the carton or cause injury.
2 Before removing the carton it is advised that
the top flaps are opened and the ancillary items
(A, B & C) are removed and set to one side.
3 The carton can now be lifted off the boiler.
Remove the plastic bag protecting the boiler
surfaces and place safely away from the working
area.
Remove 2 screws at the rear of the board
securing the board to the pallet.
Slide the boiler and board off the pallet.
4 Grip the outer sides of the front panel (D) and
pull up and away from retaining lugs (E).
Remove securing screw at the front of the
boiler.
Remove remaining screws at the rear of the
boiler.
The boiler is mounted on small wheels and
two people are recommended to move the boiler
from the board taking care not to damage the
panels or the floor.
5 Remove the split bracket (F) from the boiler
pipework by releasing the two retaining screws.
At all times the correct method for handling
heavy objects should be strictly observed.
GENERAL HANDLING GUIDELINES:
Lift only a manageable weight, or ask for help.
When lifting, bend the knees, and keep the
back straight and feet apart.
Do not lift and twist at the same time.
Lift and carry items close to the body
Wear protective clothing and gloves to protect
from any sharp edges
THIS BOILER IS NOT SUITABLE FOR ROOF
SPACE INSTALLATION.
A - Mounting frame
B - Installation pack
C - Literature pack
UNPACKING THE BOILER
3
1
5
2
A
B
C
D
4
E
F