General information
6.1
Fuel
This appliance is designed to use 28 second kerosene, no other
fuel must be used.
6.2
Boiler installation
Boiler location
To prevent “wetting” it is recommended that the flue terminal
faces away from walls.
This boiler is only suitable for installing externally at a suitable
location onto a fixed, permanent, rigid surface capable of
supporting the boiler weight. Wood and tarmac hardstandings
are not recommended.
The boiler must be installed on a flat level surface to ensure that
condensate does not enter the primary heat exchanger.
The cabinet is not load bearing, and only provides weather
protection for the boiler inside.
There must be sufficient hard standing and access around the
boiler for servicing.
WARNING:
▶ External equipment operating at 230 Volts
must not be serviced or repaired during
adverse weather conditions.
▶ Do not use pressure washers or steam
cleaners on this appliance or cabinet.
WARNING:
Boiler installation:
▶ This boiler must not be installed where
here is a potential for excessive ground
water coverage.
▶ Never allow the flue terminal or air inlet to
become obstructed by plants or any other
objects.
600mm
FRONT
2500mm
2500mm
600mm
600mm
50mm
2500mm
600mm
10mm
65mm
45mm
BASE
6720809792-05.1Wo
FRONT
FRONT
PLAN
VIEW
PLAN
VIEW