
Manual 26185
TecJet 110 Fuel Metering System
Woodward
iii
Regulatory Compliance
The TecJet™ 110 is suitable for use in Class I, Division 2, Groups A, B, C, and D
per CSA for Canada and US, or non-hazardous location only.
The TecJet 110 wiring must be in accordance with North American Class I,
Division 2, or Zone 2 wiring methods as applicable, and in accordance with the
authority having jurisdiction.
Wiring for the TecJet 110 power input must be suitable for at least 85 °C.
Connect ground lug of TecJet 110 to earth ground.
EXPLOSION HAZARD—Do not connect or disconnect electrical
connections while circuit is live unless the area is known to be non-
hazardous.
Substitution of components may impair suitability for Class I,
Division 2 or Zone 2 applications.
RISQUE D’EXPLOSION—Ne pas raccorder ni débrancher
tannt que l’installation est sous tension, sauf en cas
l’ambiance est decide’ment non dangereuse.
La substitution de composants peut rendre ce matériel
inacceptable pour les emplacements de Classe I, Division 2
ou Zone 2.
Due to the hazardous location listing associated with this product,
proper wire type and wiring practices are critical to operation.
Do not connect any cable grounds to “instrument ground”, “control
ground”, or any non-earth ground system. Make all required
electrical connections based on the wiring diagram per Figure 2-2.