SYSTEM CONFIRMATION
Once all leaks have been identified and repaired, reassemble all parts of the lifter.
A vacuum test, as described in the instruction manual, should be performed following any repair or
service to a vacuum lifter.
Note: If system is equipped with shut-offs or quick connects, a vacuum test should be performed
with these parts in every manner of use (i.e. shut-off valves should be tested in both the open and
closed position, quick connect valves should be tested both when connected and disconnected).
All parts must be verified in relation to their function and the lifter must pass all vacuum tests before
returning to operation.