MRT4-DC3: #35068
Rev 7.2/4-21
10
Various pad frame configurations enable the lifter to match different load dimensions. The
illustrations on the preceding page show all approved configurations. Dimensions show Pad
Spread for a standard MRT411LDC(3) lifter (see “SPECIFICATIONS” on page 3 for other models).
Caution:
Position the vacuum pads for the 2 circuits of the dual vacuum system (marked “1” and
“2” in the preceding illustrations).
1)
Use only approved pad frame
configurations.
Securely position vacuum hoses to
avoid damage during lifter operation.
Choose an approved configuration to
maximize support across the load
surface and to minimize load overhang
(see
).
2) Install or remove the extension arms
and reposition the movable pad mounts as needed.
Installing/Removing Extension Arms and Repositioning Vacuum Pads
1)
4A
4B
3B
2A
3A
1A
Remove the cotterless hitch
pin (circled in fig. 1A) that
secures the movable pad
mount to the pad frame.
2) Remove the vacuum pad
from the pad frame (fig. 2A).
3) Insert the extension arm into
the pad frame (fig. 3A). Then
insert a cotterless hitch pin
to secure it (fig. 3B).
4) Position the movable pad
mount on the extension arm
(fig. 4A). Then insert a
cotterless hitch pin to secure
it (fig. 4B).
Notes: Repeat or reverse these
steps to configure the pad frame as
needed. Store removed
components in a clean, dry
location.
ASSEMBLY