Woodbridge B0933 Installation And Care Manual Download Page 9

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

www.woodbridgebath.com

ADJUSTMENT & MAINTENACE (FILL VALVE)

Instructions:

When valve installed, the critical level mark 
on fill valve (identified by C.L. mark on 

valve body) shoud be at least 1" above top 
of the over flow pipe.

Required:

• Water temperature: 36-112ºF

Important:

Under no circumstances seller shall not be liable for any and 

all incidental damages sustained in connection with this 

product
Neither manufacture, nor distributor, nor retailer is 

responsible for water damage or flood caused due to use of 
this product.
Under no circumstances seller shall not be liable for any and 

all fees, cost of installation/reinstallation/removal, 

subsequent damage or transportation in case of the product 
defect

95mm

58mm

M

ax 289mm, M

in 189mm

(M

ax 344mm, M

in 244 mm

)

M

ax 230

mm, M

in 90mm

(M

ax 285mm, M

in 145

 mm

)

Max 19.5mm - Min 8.5mm

45mm

WL

Remove the worn-out fittings and clean your tank prior to the installation of the new ones. There might be a lot of impurities in your 
tank that may cause damage to the new parts if you do not clean them out. The tank must be absolutely clean prior to installation.

Check the fill valve and 
make sure that it does 
not have any damaged or 

missing parts

1. Press buckle and unscrew.
2. Pull the valve upwards or press down to desired height.
3. Unscrew the valve body and fasten the buckle

Rotating screw, rise or lower the water level 
to adjust water level to suitable position 
(water volume will gradually increase when 
the adjuster is moved upward from the 

bottom.)

1. PREPARATION

2. WATER LEVEL ADJUSTMENT

Press and

unscrew

Solution 1

Pull upwards

press down to

desired height

Unscrew

clockwise

and fasten

valves

Rotate screw to adjust

desired water level

Solution 2

Install the valve into tank. Do 
not use any wrench tools. 
Fasten with hand only.

Connect water supply to the fill 
valve. Turn on water.

Turn off water supply valve 
before height adjustment of the 
toilet's fill valve.

Put the refill tube into the white 
cap hole firmly.

3. FILL VALVE INSTALLATION

IMPORTANT: 

Do not use or drop any chlorine or any other chemicals. Use of chemical products will result in damage to the fill 

valve and flush valve components and may cause flood and property damage. Do not overtighten bolts/nuts as it may and will 
cause damage to the toilet parts and componets.

Important Note: Flush GPF amount is factory set. No addi

onal adjustment is required.  This page is for reference only. 

All adjustments are already made by manufacturer.

C.L.

8

R

WOODBRIDGE 

ELONGATED  TOILET 

Summary of Contents for B0933

Page 1: ...tional Plumbing Code IPC 2018 International Residential Code IPC CSA B45 5 IAPMO Z124 2017 Plastic Plumbing Fixtures Compliance with the following codes standard PREFERED EDUCATION PROVIDER LISTED TM ICC SCC Accredited CB P S OCPS Accrédité CCN ANSI ACCREDITED ISO IEC 17065 Product Certification Body 1000 Customer Service Phone 562 229 0088 Monday Friday 9 AM 5 PM Pacific Time Or Email help woodbr...

Page 2: ...T BE OBSERVED FOR SAFE INSTALLATION We reserves the right to change update modify alter redesign this manual product or its policies without prior noধce We shall not be liable for any injuries or property damages in connection with this product during installation or use of this product This products must be installed by a fully insured and licensed plumber only Installation of any our product by ...

Page 3: ...ficaধons Configuraধons are subject to change without noধce Pls measure toilet on site before installaধon Please note that installer s must be cerধfy or warranty will be voided Measurements herein supersede all others published prior to purblicaধon date shown below 12 Rough in Standard 15 1 2 28 1 4 6 1 2 1 1 8 18 14 1 4 26 3 4 10 5 8 15 14 ...

Page 4: ...ers published prior to purblicaধon date shown below 12 Rough in Standard Wall Floor 12 Rough in Standard Side View Side View Back View Wall Floor Flush GPF amount is factory set No addiধonal adjustment is required Tank Top View Inside Half Flush 1GPF Adjust the water level in the toilet s tank if neccessary by rotaধng the adjustment screw to increase or decrease a level of water in the toilet s ta...

Page 5: ...ugh the holes and align bolts horizontaly See Figure 2 Figure 3 INSTALL WAX RING Important safety glasses must be worn by the installer and all bystanders Cover the floor with a soft close blanket Carefully turn the toilet on it s side or upside down on the blanket with assistance of a second person Install wax ring over the horn discharge located on the bottom of the toilet s bowl See Figure 3 No...

Page 6: ...for water damage or flood caused due to use of this product Under no circumstances We shall not be liable for any and all fees cost of installation reinstallation removal subsequent damage or transportation in case of the product defect Figure 6 INSTALL NEW TOILET Step 1 Lift and carefully put the toilet over the closet flange so the closet bolts can go through the mounting holes in the toilet s b...

Page 7: ... toilet seat and cover Clip on the toilet seat and cover Aligh the toilet seat and cover with ceramic Take off the toilet seat and cover by pressing both pushbuttons Insert the hinges into the toilet Tighten the screws of the hinges Untighten the screws a bit by turn ing them 90 right Seat and cover Hinge set ELONGATED TOILET ...

Page 8: ...sh button and lock the nut to make it well fixed in the tank The distance between the rod tail and valve push button must be 1 2mm Rotate the valve clockwise to adjust its position inside of the toilet s tank Install the sealing gasket Put the refill tube into the white cap hole firmly The refill tube can t be lower than the watersealing level If the rod is too short please re adjust it outward ro...

Page 9: ...s not have any damaged or missing parts 1 Press buckle and unscrew 2 Pull the valve upwards or press down to desired height 3 Unscrew the valve body and fasten the buckle Rotating screw rise or lower the water level to adjust water level to suitable position water volume will gradually increase when the adjuster is moved upward from the bottom 1 PREPARATION 2 WATER LEVEL ADJUSTMENT Press and unscr...

Page 10: ...is clogged due to dirty water 4 Improper refill hose installation 1 Turn on inlet valve switch 2 Adjust inlet valve position 3 Clean the filter screen 4 Install refill hose correctly see diagram on the right Carefully take out the filter from inlet by using pliers Use water to wash and clean the filter and adapter from any debris Re install the filter and re connect the water supply line FILL VALV...

Reviews: