LubeMizer Installation
Control Box Wiring
LubeMizer Installation
LMS99doc032619
1-7
1
Rev. B.00+:
Install the supplied 6" red wire to the #2 terminal of the power feed
drum switch.
NOTE:
If your sawmill is equipped with a debarker option, disconnect
the red debarker on/off switch wire from the #2 power feed drum switch terminal.
Use the supplied #10-24 x 1/2" screw, flat washer and lock nut to connect wire #250
from the LMS control to the 6" wire from the #2 power feed drum switch terminal
(and debarker wire, if applicable). Place the supplied rubber tube over the wire con-
nection, fold and secure with the two wire ties supplied.
See Figure 1-4.
Locate black wire #20 connected to the ground stud in the rear of the sawmill con-
trol. Cut the wire in two approximately 5" from the ground stud.
FIG. 1-3 REV. A.00 - A.01
FIG. 1-4 REV. B.00+
Rubber
Tubing
Screw
3H0344-1
Lock Nut
Flat Washer
LMS wire #250
6” Wire from
Power Feed Drum
Switch Terminal #2