Setup and Operation
Using optional log lift
Setup and Operation
doc072919
3-6
3
2.
Move the pusher to the right by moving the log splitter handle to the right.
3.
Move the log back onto the cutting table and repeat the steps above.
DUAL LOG OPERATION
1.
Perform the first two steps above.
2.
Load a second log onto the table.
3.
Alternate cuttings by repositioning the logs onto the cutting table after each cut.
4.
Repeat these steps until finished.
Using optional log lift
WARNING!
Ensure the area is clear before lowering the log lift
platform. Failure to follow this may result in serious injury or death.
5.
Unpin the log lift platform from the transport position.
6.
Lower the log lift platform by moving the log lift handle to the down position.
7.
Position a log onto the log lift platform.
See Figure 3-5.
IMPORTANT!
The log must be less than 24” long, 27” in diameter,
and 300 lbs
.
FIG. 3-5
EF3MAN-03