![Wood-mizer 1992 LT30HD Operation & Maintenance Manual Download Page 33](http://html1.mh-extra.com/html/wood-mizer/1992-lt30hd/1992-lt30hd_operation-and-maintenance-manual_994629033.webp)
Setup & Operation
Preparing The Sawmill For Operation
Setup & Operation
HD92doc042701
2-5
2
2.3
Preparing The Sawmill For Operation
1. TUV Trailers only:
See Figure 2-4. Disassemble the perimeter fence. Remove the six locking pins and two
hold-down nuts. Unplug the tail light board from the auxiliary adapter. Remove all four
sections of the perimeter fence.
Adjust the jockey wheel down by turning the crank clockwise until the wheel is planted
firmly on the ground. Set the brake by pushing the lever away from the hitch coupler.
See
Trailer Option Manual
for TUV trailer hitch operation.
FIG. 2-4