15
3064342_201505
Installation on a stratification
cylinder
Use the mounting hardware supplied with the system (2 x M10 x 100 threaded
studs + 2 x M10 nuts + 2 x M10 washers) to install it on a stratification cylinder.
After installing the buffer cylinder insulation, turn the threaded studs about 5 mm
into the threaded sleeves located on the cylinder.
Use the corrugated pipe cylinder connection set, a secure and time-saving
connection, for installing the system on stratification cylinders.
Threaded sleeves
Wall mounting
Positioning and installation may only be carried out by an authorised contractor.
The system must be installed in a location that is protected from frost.
Installation
Freshwater module installation instructions