![Wolf ComfortLine CHK Installation And Maintenance Instructions Manual Download Page 27](http://html.mh-extra.com/html/wolf/comfortline-chk/comfortline-chk_installation-and-maintenance-instructions-manual_991753027.webp)
27
3060918_1203
Commissioning report
Commissioning steps
Test values and
confirmation
1.) Water connections checked for leaks?
2.) Vented boiler and system?
3.) System pressure 1 - 2.5 bar?
4.) Function test carried out?
5.) Flue gas test:
Gross flue gas temperature
___________
t
A
[°C]
Ventilation air temperature
___________
t
L
[°C]
Net flue gas temperature
_______
(t
A
- t
L
) [°C]
Carbon dioxide content (CO
2
) or oxygen content (O
2
)
______________
%
Carbon monoxide content (CO), free of air
____________
ppm
6.) Casing fitted?
7.) System user trained, technical documents handed over?
8.) Confirm commissioning