Installation
30 | WOLF GmbH 3066501_201910
5
Installation
5.1
Transporting the boiler/stratification cylinder
Transport the heat generator and cylinder with packaging and pallet.
A sack truck is a suitable for this.
Fig. 5.1
Transporting the boiler/stratification cylinder
► Position a sack truck at the rear of the heat generator and cylinder.
► Place a strap around the heat generator.
► Transport to the installation site.
► Remove strap and packaging.
► Remove the fixing screws on the pallet.
► Lift the heat generator and cylinder off the pallet.
5.2
Checking the delivery
The following parts are included with the COB-2 and COB-2-TS:
Standard delivery
COB-2
COB-2-TS
COB-2-15/20/29/40 oil condensing boiler
●
●
TS-15/20/29 stratification cylinder
-
●
Trap with hose
●
●
Stainless steel cleaning brush
●
●
Maintenance tools
●
●
COB-2 / COB-2-TS installation instructions
●
●
COB-2 / COB-2-TS operating instructions
●
●
COB-2 / COB-2-TS service instructions
●
●
Oil filter insert 40 μm
●
●