WOERNER PEK Translation Of The Original Operation Manual Download Page 25

 
 
 
 

 

Operation manual PEK 

Page 25 of 25 

B0053 

11.2  Declaration of conformity 

 

Summary of Contents for PEK

Page 1: ...Operation manual PEK Page 1 of 25 B0053 Single line pump PEK Translation of the original operation manual Version EN 03 2017...

Page 2: ...ency in the translated text occurs the original German operation manual should be referred to for clarifi cation or the manufacturer contacted Copyright Unless permitted explicitly the dissemination r...

Page 3: ...tional usage 9 3 5 Technical data 9 3 5 1 Assemblies 9 3 5 2 Dimensions 10 3 5 3 Base unit 10 3 5 4 Level monitoring option 11 4 Functional description 12 4 1 Arrangement PEK 12 4 2 Power supply 12 4...

Page 4: ...ng 20 8 3 Inspection schedule 21 8 4 Troubleshooting fault remedy 21 8 5 Repair 22 8 6 Spare part list 22 9 Return shipment to factory 22 10 Disposal 24 11 Appendix 24 11 1 Content of the declaration...

Page 5: ...u are obliged to read and understand this opera tion manual and in particular its section Safety regulations It is your safety that is at stake Should you have any question or uncertainty contact WOER...

Page 6: ...causing serious personal injuries Warning Any possibly dangerous situation capable of causing serious personal injuries Caution Any possibly dangerous situation that might cause minor per sonal injur...

Page 7: ...d at the side of the pump body and contains information as follows Manufacturer Type PEK No order number e g 612345 1 Model year 2 4 Manufacturer and contact address Eugen Woerner GmbH Co KG Hafenstra...

Page 8: ...s area of application is determined by the medium to be delivered Hence when determining the area of application you also need to refer to the technical data sheets for the medium to be used 3 3 Ambi...

Page 9: ...g beyond the conventional one may cause serious personal and property damage The delivery of gases liquefied gases gases dissolved under pressure va pours and liquids the vapour pressure of which exce...

Page 10: ...ervoir mounted on The technical data of this unit is as follows Delivery volume per stroke not adjustable 10 cm adjustable 1 10 cm Actuating pressure p2 3 10 bar Delivery pressure p1 ca 10 x p2 8 bar...

Page 11: ...ching power max 10 30 W VA Switching voltage max 230 VUC Type of protection DIN EN 60529 IP65 Connection diagram When connecting inductive or capacitive loads the relevant suppres sor circuits need to...

Page 12: ...stic cover 5 Level switch 6 Fill strainer 7 Protective shell 8 Infinitely variable delivery control 9 Outlet G 1 8 4 2 Power supply The PEK needs compressed air that has ISO 554 class 5 quality This a...

Page 13: ...control valve opens at 32 bar Attention When air pressure is impinged suddenly the pressure control valve s start to leak pressure may be exceeded and that pressure will not build up in the outlet the...

Page 14: ...e of the pump unit 5 2 Requirements on user training Any person getting to work on the PEK must be authorised and trained for that purpose by the operator They must be able to recognise and avoid pote...

Page 15: ...sidual risks repeatedly Inform yourself about such risks in the Residual risks section 5 5 Residual risks When using the PEK properly there are no residual risks to persons and objects in its vicinity...

Page 16: ...ited to remove modify bridge or bypass any and all protect tion safety or monitoring facilities It is prohibited to reconstruct or modify the pump unit The operator should be notified of any fault or...

Page 17: ...omponents attached in accordance with the scope of delivery may still contain residues of blue dyed test oil 6 3 Installation The pump unit is ready for wall mounting and is mounted with two M8 screws...

Page 18: ...ressurisation with compressed air and the cycling of the PEK can be done by using an external directional control valve When relieving the compressed air connector be careful to bleed it completely Pr...

Page 19: ...of 32 bar 6 6 Shutdown The unit is shut down by switching the compressed air supply off 7 Operation 7 1 Refilling the reservoir The lid of the reservoir is to be used for refilling the pump Important...

Page 20: ...tricians in accordance with DIN VDE 1000 10 8 1 Cleaning Important The PEK must not be cleaned by means of high pressure cleaners or compressed air Important The use of solvent containing cleaning age...

Page 21: ...sure relief Exchange the relief valve Pressure relief valve failure Exchange the pressure relief valve Pressure release valve doesn t close Exchange the relief valve Line system leaking Seal the leaki...

Page 22: ...speedy handling you are kindly requested to send a copy of the fully com pleted declaration of compliance to us in advance The original must be attached to the freight documents For damage assessment...

Page 23: ...arged and cleaned 2 the residual contaminations left are free of any substance being harmful to health or environment 3 the materials used by us in the product s comply with the notes on the purpose o...

Page 24: ...country must be observed 11 Appendix 11 1 Content of the declaration of conformity We hereby declare that the product Piston pump type PEK as of model year 2015 meets all relevant provisions of the d...

Page 25: ...Operation manual PEK Page 25 of 25 B0053 11 2 Declaration of conformity...

Reviews: