4_
SHD-3000F5
INSTALLATION INSTRUCTIONS
1.
Select an installation position or place that can endure more than 4 times of the total weight
of the installation structure.
2.
At least 250mm or more of spare height is required above the
CEILING BOARD
.
3.
CEILING BOARD
’s thickness should be less than 50mm.
4.
Be sure to secure the SAFETY WIRE to avoid a product fall.
5.
If you want to attach the camera to the ADAPTOR, use the only provided SCREWS.
(SCREWS are shipped with PNM-9000VQ. To learn how to use them, see Step 3 on page 5.)
6.
CEILING BOARD must be able to sustain the weight of at least 10 kg.
More than 250mm
CEILING BOARD
More than 5mm,
Less than 50mm
HOW TO INSTALL
1.
Place the
TEMPLATE
on the
CEILING BOARD
and drill a guided hole.
❶
Remove the round fi lling (“C”) from the
TEMPLATE
.
➋
Place
TEMPLATE
A onto the
CEILING BOARD
to which you will attach the ceiling mount
ADAPTOR and drill a hole of Ø326mm in diameter.
See the fi gure below for the hole shape.
TEMPLATE
CEILING BOARD