Reporting Downtime and Scrap to LETS
I-1
Appendix I. Reporting Downtime and
Scrap to LETS
This appendix shows you how to report press downtime from your SmartPAC 2 control to
Wintriss’s Line Efficiency Tracking Software (LETS). The appendix discusses the six
machine states to which LETS logs press time, explains the downtime reporting features of
SmartPAC 2, shows you how to set up SmartPAC 2 to report downtime to LETS, and
provides instructions for reporting downtime.
The appendix also shows you how to use the scrap counter on the SmartPAC 2 Counters
screen in Run mode to report scrap to LETS and how to adjust the Good Parts count that is
reported to LETS.
SmartPAC’s downtime- and scrap-reporting features are available only on SmartPAC 2
versions 4.59 or higher; in addition, the LETS firmware option must be installed.
Machine States to Which LETS Logs Press Time
LETS logs all elapsed time at each press to one of six categories called machine states. The
sum of all the times assigned to these machine states for an individual press is the number of
hours in a production day (e.g., 12 hours, 24 hours, etc.). LETS selects the machine state to
which to log press time on the basis of downtime reporting and other information it receives
from SmartPAC 2. Machine states are differentiated as follows:
•
Running Time–Press is running and making parts
•
Idle Time–Press is stopped, no SmartPAC error has occurred, and the reason the press is
stopped has not been documented in SmartPAC 2
•
Unplanned Downtime–Press is stopped due to a SmartPAC 2 error, or if the press is stopped
for another reason, that reason has been documented in SmartPAC 2 as a downtime reason
other than Planned Downtime or Tool Change
•
Planned Downtime–Press is stopped, and the reason has been documented in SmartPAC 2
as Planned Downtime
•
Changeover Time–Press is stopped, and the reason has been documented in SmartPAC 2 as
Tool Change
•
Offline Time–Press is stopped because there is no power to the press or the network is
down
The Planned Downtime machine state should only be assigned for lunch and coffee
breaks, meetings, training, etc. Planned Downtime is not used in calculating Overall
Equipment Effectiveness (OEE) and, therefore, does not reduce the OEE value.
NOTICE
Summary of Contents for SmartPAC 2
Page 2: ......
Page 4: ......
Page 6: ......
Page 28: ...1128600 SmartPAC 2 with WPC 2000 Integration User Manual xxii Table of Contents ...
Page 44: ...1128600 SmartPAC 2 with WPC 2000 Integration User Manual 1 16 Introduction ...
Page 186: ...1128600 SmartPAC 2 with WPC 2000 Integration User Manual 3 26 Keyboard Displays Etc ...
Page 440: ...1128600 SmartPAC 2 with WPC 2000 Integration User Manual D 12 Updating SmartPAC 2 Firmware ...
Page 478: ...1128600 SmartPAC 2 with WPC 2000 Integration User Manual G 6 Replacing SmartPAC 2 PC Board ...
Page 548: ...1128600 SmartPAC 2 with WPC 2000 Integration User Manual GL 8 Glossary ...
Page 558: ...1128600 SmartPAC 2 with WPC 2000 Integration User Manual IN 10 Index ...
Page 560: ......
Page 562: ......
Page 564: ......
Page 566: ......
Page 568: ......
Page 570: ......
Page 572: ......
Page 574: ......
Page 576: ......
Page 577: ......
Page 578: ...APPROVALS SCALE C SIZE TITLE SHEET OF DRAWING NUMBER REV ...
Page 579: ...APPROVALS SCALE C SIZE TITLE SHEET OF DRAWING NUMBER REV ...
Page 580: ...APPROVALS SCALE C SIZE TITLE SHEET OF DRAWING NUMBER REV ...
Page 581: ...APPROVALS SCALE C SIZE TITLE SHEET OF DRAWING NUMBER REV ...
Page 582: ......
Page 583: ......
Page 584: ......
Page 585: ......
Page 586: ......
Page 587: ......
Page 588: ......
Page 589: ......
Page 590: ......
Page 591: ......
Page 592: ......
Page 593: ......
Page 594: ......
Page 595: ......
Page 596: ......
Page 597: ......
Page 598: ......
Page 599: ......
Page 600: ......
Page 601: ......
Page 602: ......
Page 603: ......
Page 604: ......