V1
2
Winton WLR
General Safety Information (continued)
Machinery Pre-Use Checks
On receipt of your new Winton machine and again within the first 4 hours of use, or the ‘shake
in’ period as we like to call it, we always recommend checking over the machine.
•
Check all bolts, nuts and screws are tight on the unit.
•
Tighten/check any bolts and nuts securing blades.
•
If your machine has belts check the tension and adjust if required.
•
Apply grease to grease points if necessary.
•
Remove support/storage stands before operating machinery.
•
Check oil levels and top up if needed.
Tractor Pre-Use Checks
Check that the machine is properly attached to the tractor. Ensure that secure pins are used on
the linkage mounting pins.
Be sure to add extra weights to the front of the tractor or add wheel weights if required.
Install and secure all safety guards, doors and covers before starting.
Bystanders should leave the immediate area before connecting the drive from the tractor.
Running/Operating Checks
•
Always keep the PTO output from the tractor at 540 RPM when running machinery.
•
Never use machinery at excessive speeds.
Post-Use Regular Checks
Check blades, belts and wearing parts. Be sure they are not damaged and blades swing freely in
their mount. Repair or replace as required.
Clean machinery and check for/clear any entangled material which may have got stuck around
any rotating parts.
Summary of Contents for WLR Series
Page 7: ...V1 5 Winton WLR ...
Page 11: ...V1 9 Winton WLR ...
Page 12: ...www wintonmachinery co uk ...