Electrical installation:
DANGER! Danger of death due to live components!
Have the electric installation of the washer and the auxiliary devices belonging to it carried out
only by a specialist firm of electricians approved by the responsible electricity board in accor-
dance with the norms.
Observe the technical connection regulations.
Before commissioning the washer, check that all electrical protection systems are working
correctly.
Caution! The machine is only to be considered free from voltage when the mains disconnect-
ing switch (mains switch) provided by the customer is switched off.
The electrician must take note of the following:
•
The total connected load of the machine is stated on the rating plate.
•
Fuse the electrical connection of the machine as a
separately fused circuit
as part of the building
system using slow-blowing fuses or circuit breakers in accordance with the total connected load (see
rating plate).
•
Install a mains disconnector as well as a residual-current circuit breaker (RCCB) in the electrical
feeder, in accordance with the regulations. These switches must disconnect all poles and must have
the prescribed contact gap. The installation location must be close to the dishwashing machine and
must be easily accessible.
•
Connect the dishwashing machine and the mounted table system to a protective circuit installed and
tested in accordance with the regulations.
•
Connect the machine to your potential equalization system. The screw for this connection is located in
the machine's base.
If you set up the machine on a supporting stand, the potential equalization system must be put be-
tween the machine and the stand.
Connecting cable
The connecting cable may only be changed or replaced by the manufacturer, its customer service represen-
tative or a similarly qualified person. Use an H07 RN-F type cable or equivalent.
Phase sequence of main power cable
Mains
1/N/~
2/-/~ 3/N/~ 3/-/~
No. of leads
3
3
5
4
PE green-yellow
green-yellow
green-yellow green-yellow
N
blue -
blue -
L1
brown brown grey brown
L2 - blue
brown
grey
L3
- - black
black
Final work:
The machine must be entirely connected to the electrical power mains and the fresh water supply and waste
water drain system. The electrical safety system must be tested and fully functional.
A Winterhalter customer service technical performs the initial start-up. In the process, the operator of the
machine is instructed in how the machine works.
3.2 Initial
start-up
After the machine has been connected to your supply lines according to regulations, contact the Winterhalter
agent responsible for your locality in order to perform the initial start-up and be instructed in how to run the
machine.