ball bearing retainer
16
15
Chart 7
Step 15. Insert the two Grommets on top of the Main Desk and one Grommet on top of the
Return Desk.
Step 16.
Install the drop front center drawer (C) and keyboard pullout (K) to place.
Important:
(Be sure to move the ball bearing retainer all the way to the front of the glide
and carefully slide the rails into the glides and ball bearing retainer.)
Assembly is now complete
C
K
Chart 6
Step 12. Place and align R1 Desk Top (B) and R2 Desk Top (I) over the bases. Connect RHS Glide
Panel (D) to R1 Desk Top (B) and use
1-1/4" machine bolts (3PCS)
and use 1-1/4"
flat head wood scew
(2PCS) to reinforce the assembly.
Step 13. Insert
short 1" flat head wood screws
(15 PCS) through metal figure 8 to connect R1
Desk Top (B) to Main Desk base and R2 Desk Top (I) to Return Desk base.
Step 14. Use long (1-1/4") flat head wood screws (2 PCS) to connect crossbar (G) and (L) to the
the R1 Desk Top (B) and R2 Desk Top (I).
X2
M
B
D
13
13
X15
I
F
H
12
12
14
14
X2
1-1/4"
X3
12