 싸이클론 퇴출구 문을 열고 안쪽에 쌓여있는 재를 청소 한다.

 Open the door  of cyclone ash outlet, clean inside by raking out stacks of ashes

-

-

 다단펌프 작동시 

⑧ 

SOLENOID V/V가 같이 작동하는지 확인 한다.

 When operating  multistage pump 

 please check SOLENOID V/V is working together

4

 After draining the water from the incinerator 

 please check that the water is properly

supplied into the tank and the boiler compound is also put inside.

⑥ 

소각로 드레인 실시후 

② 

급수물통에 급수가 정상적으로 되는지 확인하고, 청관제 주입 상태도 확인 한

다.

  2. 가동전 점검 사항(Check point before operation)

가동전 준비 사항(일일 점검 사항) Preparation before operation (Daily check)

※ 블로우 다운이란? 스팀보일러의 농축된 보일러수를 일정 압력(1kg/㎤~2kg/㎤)에서 배출시켜
    주는 것을 말한다.
    What is BLOW DOWN?  It make boiler water drained on a constant pressure (1kg/㎤~2kg/㎤)

inside steam boiler

Summary of Contents for WT-2500-4000

Page 1: ...HEAD OFFICE FACTORY 22 NOKSANSANDAN 361 RO SONGJUNG DONG GANGSEO GU BUSAN KOREA TEL 82 51 831 0962 3 HOMEPAGE www perfectboiler co kr Separable Incineration Steam Boiler User s Manual...

Page 2: ...2 3 4 5 6 7 1 8 A S 9 1 1 PVC 10...

Page 3: ...ity of the problem caused by renovation of pipe and electronic devices without notice Be careful of burning body since the main body and pipes are running on a high temperature The operator should wea...

Page 4: ...1 The name of each part 2 Check point before operation 3 How to use Control Panel 4 How to operate Boiler 5 How to inspect and clean 5 6 7 8 9 10 11 15 CONTENTS 1 2 3 4...

Page 5: ...Ash Outlet Door 3 Level Guage Drain Valve 4 Boiler Drain Valve 5 Level Gauge Mcdonnell 6 Boiler Overheat Prevention Sensor 7 Waste Inlet Door 8 2 2nd Chamber Clean Door 9 2 2nd Combustion Chamber Ther...

Page 6: ...SCRIPTION REMARK 15 Incinerator Water Supply Tank 16 Safety V V 17 SOLENOID V V Water Supply 18 Multistage Pump 19 Exhaust Fan 20 Chimney Clean Door 21 Cyclone Ash Clean Door 22 Pressure Switch 23 SOL...

Page 7: ...e remained ashes after burning At this moment rake out the hard ashes on the bottom of wall surface as much as possible Please drain the water until the warning light and buzzer is operating by openin...

Page 8: ...ing together 4 After draining the water from the incinerator please check that the water is properly supplied into the tank and the boiler compound is also put inside 2 Check point before operation Pr...

Page 9: ...5 The display and the name of switch 3 How to use Control Panel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25...

Page 10: ...6 3 How to use Control Panel 1 2 3 ITEM NO DESCRIPTION REMARK 1 2 3 4 5 SOLENOID V V 6 OFF 7 8 A B 9 ON 10 ON 11 12 13 14 7 15 16 17 18 19 20 21 1 2 22 2 23 3 24 25 180...

Page 11: ...nother when you repair or clean 9 Tower lamp on off switch Turn on while operating 10 Buzzer on off switch The alarm will be operated in case it is overheated and in low water level Turn on while oper...

Page 12: ...e sure that you have put reasonable quantities inside and it has been buried in places because if you oversupply the waste will not get fire on the bottom So it is going be finished as incomplete comb...

Page 13: ...the required steam pressure please slowly open the main steam valve In case of being the steam header please open the main steam valve on the top of boiler and control the valve of steam header 450 8...

Page 14: ...e valve and blow down in the state of pressure dropped If the blower stops in the state which has not completely burned The combustion nozzle will be blocked it is possible to generate exhaust 4 How t...

Page 15: ...weekly and inside combustion chamber the ashes from the surface of a wall When you clean the nozzle please use the driver and push to the end as below picture whether to check the holes are blocked or...

Page 16: ...automatic injection device If not please fill in again When you drain while daily inspection please check more than once a week whether precipitate and solid are settled or not by filling the drained...

Page 17: ...to the bottom and check there is scale 8 Since the boiler has been heated you have to drain after 8 hours later in the state of complete combustion Monthly check point 5 How to inspect and clean 13 L...

Page 18: ...es in cyclone press stop button and supply water into the boiler by manual It is one of reason for the breakdown if you operate pump automatically without water in cyclone since the air comes into the...

Page 19: ...boiler 15 Please open the front and back door Clean soot and dust on the pipe by using cleaning equipment which is provided At this time it is more effective if you use air compressor Monthly check po...