3) 2차 연소실 청소 (Cleaning 2nd combustion chamber)

4) 송풍기 확인 (Check the blower)

5) 보일러수 확인 (Check the boiler water)

12

5. 점검 및 청소 방법 (How to inspect and clean)

주간 점검 사항 (Weekly check point)

송풍기 벨트의 장력을 확인 한다
벨트가 늘어나거나 갈라지면 교체를 한다

Check the tension of belt and replace if the
belt is streched or cracked

구리스 자동 주입장치에 구리스가 있는지 확인을 하고 없
으면 다시 채워준다.

Check if there is grease on automatic injection device.
If not, please fill in again

When you drain while daily inspection, please check more than once a week whether precipitate
and solid are settled or not by filling the drained water into the transparent container.
If so, a solid body is condensed too much, please drain all the water and fill with the new one.

일일점검 중의 보일러 드레인을 실시 할 때, 일주일에 한번 이상 투명한 용기에 물을 받아서 침전물,
고형물들이 가라 앉는지 확인 한다.
이럴 경우 고형물질이 많이 응축된 상태이므로 전체 물을 다 빼내고 새로운 물을 채워 준다.

2

 

연소실

 

청소구를

 

열고

 

진공청소기등을

 

이용하여

 

내부의

 

재와

 

분진을

 

청소

 

한다

.  

Open the door of 2nd combustion 
chamber and start cleaning ashes and 
dust inside by using vacuum.

 

Summary of Contents for WT-2500-4000

Page 1: ...HEAD OFFICE FACTORY 22 NOKSANSANDAN 361 RO SONGJUNG DONG GANGSEO GU BUSAN KOREA TEL 82 51 831 0962 3 HOMEPAGE www perfectboiler co kr Separable Incineration Steam Boiler User s Manual...

Page 2: ...2 3 4 5 6 7 1 8 A S 9 1 1 PVC 10...

Page 3: ...ity of the problem caused by renovation of pipe and electronic devices without notice Be careful of burning body since the main body and pipes are running on a high temperature The operator should wea...

Page 4: ...1 The name of each part 2 Check point before operation 3 How to use Control Panel 4 How to operate Boiler 5 How to inspect and clean 5 6 7 8 9 10 11 15 CONTENTS 1 2 3 4...

Page 5: ...Ash Outlet Door 3 Level Guage Drain Valve 4 Boiler Drain Valve 5 Level Gauge Mcdonnell 6 Boiler Overheat Prevention Sensor 7 Waste Inlet Door 8 2 2nd Chamber Clean Door 9 2 2nd Combustion Chamber Ther...

Page 6: ...SCRIPTION REMARK 15 Incinerator Water Supply Tank 16 Safety V V 17 SOLENOID V V Water Supply 18 Multistage Pump 19 Exhaust Fan 20 Chimney Clean Door 21 Cyclone Ash Clean Door 22 Pressure Switch 23 SOL...

Page 7: ...e remained ashes after burning At this moment rake out the hard ashes on the bottom of wall surface as much as possible Please drain the water until the warning light and buzzer is operating by openin...

Page 8: ...ing together 4 After draining the water from the incinerator please check that the water is properly supplied into the tank and the boiler compound is also put inside 2 Check point before operation Pr...

Page 9: ...5 The display and the name of switch 3 How to use Control Panel 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25...

Page 10: ...6 3 How to use Control Panel 1 2 3 ITEM NO DESCRIPTION REMARK 1 2 3 4 5 SOLENOID V V 6 OFF 7 8 A B 9 ON 10 ON 11 12 13 14 7 15 16 17 18 19 20 21 1 2 22 2 23 3 24 25 180...

Page 11: ...nother when you repair or clean 9 Tower lamp on off switch Turn on while operating 10 Buzzer on off switch The alarm will be operated in case it is overheated and in low water level Turn on while oper...

Page 12: ...e sure that you have put reasonable quantities inside and it has been buried in places because if you oversupply the waste will not get fire on the bottom So it is going be finished as incomplete comb...

Page 13: ...the required steam pressure please slowly open the main steam valve In case of being the steam header please open the main steam valve on the top of boiler and control the valve of steam header 450 8...

Page 14: ...e valve and blow down in the state of pressure dropped If the blower stops in the state which has not completely burned The combustion nozzle will be blocked it is possible to generate exhaust 4 How t...

Page 15: ...weekly and inside combustion chamber the ashes from the surface of a wall When you clean the nozzle please use the driver and push to the end as below picture whether to check the holes are blocked or...

Page 16: ...automatic injection device If not please fill in again When you drain while daily inspection please check more than once a week whether precipitate and solid are settled or not by filling the drained...

Page 17: ...to the bottom and check there is scale 8 Since the boiler has been heated you have to drain after 8 hours later in the state of complete combustion Monthly check point 5 How to inspect and clean 13 L...

Page 18: ...es in cyclone press stop button and supply water into the boiler by manual It is one of reason for the breakdown if you operate pump automatically without water in cyclone since the air comes into the...

Page 19: ...boiler 15 Please open the front and back door Clean soot and dust on the pipe by using cleaning equipment which is provided At this time it is more effective if you use air compressor Monthly check po...

Reviews: