INSTALLATION
Please refer to the contract arrangement and site instructions as applicable.
It is recommended that a concrete foundation (to take foundation bolts – not
supplied) should be provided for the machine to be mounted on
Before completing the installation, check that the main mixer frame is level
with a spirit level. Packings should be inserted as required under the main
frame. Check that the pan is seated and that the pan rack and drive gear are in
mesh.. Also check that all the blade clearances are in line with the maintenance
instructions.
On connecting to the power supply, the wiring diagram must be referred to.
N
ote:- it is recommended that the mains electrical supply is taken via an
earth leakage circuit breaker.
The wiring is correctly connected to the motors when the pan and star drive
rotate as follows:-
•
The mixing pan and mixing star rotate anti-clockwise when looking from
the top.
NOTE:- the proximity sensors below the pan and star drive lifting
mechanism are fitted with small LED’s which light up when the sensors
are operating correctly.
Summary of Contents for CUMFLOW RP100XD MK2
Page 2: ......
Page 5: ......
Page 6: ...OPERATING AND MAINTENANCE MANUAL SECTION 1 GENERAL INFORMATION RP100XD MK2 ...
Page 7: ......
Page 14: ...INSTALLATION DRAWING ...
Page 15: ......
Page 16: ...OPERATING AND MAINTENANCE MANUAL SECTION 2 INSTALLATION AND OPERATING INSTRUCTIONS ...
Page 17: ......
Page 25: ......
Page 26: ...OPERATING AND MAINTENANCE MANUAL SECTION 3 TECHNICAL SPECIFICATION AND MAINTENANCE ...
Page 27: ......
Page 33: ...LUBRICATION CHART ...
Page 34: ......
Page 35: ...OPERATING AND MAINTENANCE MANUAL SECTION 4 MIXER SPARE PARTS ...
Page 36: ......
Page 37: ...RP100XD MK2 MIXING PAN DRIVE ...
Page 39: ...RP100XD MK2 STAR DRIVE ASSEMBLY ASSEMBLED LENGTH OF COUPLING ITEM 3 ON SHAFTS IS 73MM ...
Page 42: ...RP100XD MK2 MIXING STAR ASSEMBLY ...
Page 44: ...RP100XD MK2 MIXING STAR LIFTING ARRANGEMENT ...
Page 46: ...RP100XD MK2 COVERS GUARDS ...
Page 49: ...PAGE INTENTIONALLY BLANK ...
Page 52: ...RP100XD MK2 DECALS AND LOGOS CROKER CUMFLOW RP100XD 1 2 4 5 6 7 8 9 10 11 12 13 ...
Page 54: ......
Page 55: ...OPERATING AND MAINTENANCE MANUAL SECTION 5 ANCILLARY EQUIPMENT SPARE PARTS ...
Page 56: ......
Page 57: ...PAGE INTENTIONALLY BLANK ...
Page 58: ...RP100XD PAN TROLLEY ...
Page 60: ...RP100XD FOUR WHEEL PAN TROLLEY ...
Page 63: ......
Page 64: ...OPERATING AND MAINTENANCE MANUAL SECTION 6 ELECTRICAL SYSTEM ...
Page 65: ......
Page 66: ...Electrical Control Circuits dwg 11 03 02 10 55 09 Scaled to fit ...
Page 67: ...V06302 dwg 11 12 02 07 03 44 Scaled to fit ...
Page 68: ...Electrical Power Circuits dwg 11 03 02 10 58 17 Scaled to fit ...
Page 69: ...V06303 dwg 11 12 02 07 04 45 Scaled to fit ...
Page 70: ...General details of Control Panel dwg 11 03 02 11 01 09 Scaled to fit ...
Page 71: ...V06301 dwg 11 12 02 07 02 37 Scaled to fit ...
Page 72: ...Material Parts List dwg 11 03 02 11 03 32 Scaled to fit ...
Page 73: ...V063PL1 dwg 11 12 02 07 01 06 Scaled to fit ...
Page 74: ......
Page 75: ...OPERATING AND MAINTENANCE MANUAL SECTION 7 MISCELLANEOUS ...
Page 76: ......