13.3.3
HP fuel pipe (fuel rail to injection valve) - grind the sealing face
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements
0.0 man-hours
Duration for performing the procedure
0.5 man-hours
Duration for performing the requirements after job completion
0.0 man-hours
Personnel
Description
Specialization
QTY
Engine crew
Intermediate
1
Support equipment
Description
Part No.
CSN
QTY
Grinding tool
94871
1
Stencil
94871A
1
Hand drill
NA
1
Supplies
Description
QTY
Emery paper (different grades)
AR
Polishing cloth
AR
Spare Parts
Description
Part No.
CSN
QTY
None
SAFETY PRECAUTIONS
•
None
PRELIMINARY OPERATIONS
•
The HP fuel pipe must be removed, refer to section
13.3.2 HP fuel pipe (fuel rail to
X72DF
AA00-8733-00AAA-655A-A
Maintenance Manual
HP fuel pipe (fuel rail to injection valve) - grind the sealing face
Winterthur Gas & Diesel Ltd.
- 748 -
Issue 002 2020-10
Summary of Contents for X62DF
Page 881: ...Approved Tightening Instructions Rev I Page 1 14...
Page 882: ...Approved Tightening Instructions Rev I Page 2 14...
Page 883: ...Approved Tightening Instructions Rev I Page 3 14...
Page 884: ...Approved Tightening Instructions Rev I Page 4 14...
Page 885: ...Approved Tightening Instructions Rev I Page 5 14...
Page 886: ...Approved Tightening Instructions Rev I Page 6 14...
Page 887: ...Approved Tightening Instructions Rev I Page 7 14...
Page 888: ...Approved Tightening Instructions Rev I Page 8 14...
Page 889: ...Approved Tightening Instructions Rev I Page 9 14...
Page 890: ...Approved Tightening Instructions Rev I Page 10 14...
Page 891: ...Approved Tightening Instructions Rev I Page 11 14...
Page 892: ...Approved Tightening Instructions Rev I Page 12 14...
Page 893: ...Approved Tightening Instructions Rev I Page 13 14...
Page 894: ...Approved Tightening Instructions Rev I Page 14 14...