Ducting connection
THE PIPE CONNECTION
Both units are loaded with an inert gas (nitrogen). Connect the 2 units by a copper line 1/4" for the la
liquid line and 3/8" for the gas line. The nuts are provided. Put them on the copper rigid pipe before
performing the extender.
The maximum length is of 20 m,
the
must not exceed 10
.
Lenghts
0-5 m
5 to 10 m
10 to 15 m
15 to 20 m
When all is working properly, before disconnecting the
Disconnect then the pipes and replace
3.5
Electric connection
3.5.1
Connection of outside unit
-
Unscrew and remove the cover from outside unit
-
Unscrew the cover from the waterproof box
-
Connect the box and the outside unit via the
(§3.4.5)
-
Close the waterproof box
-
Close the outside unit
3.5.2
Connection of inside unit
-
Unscrew and remove the front cover
-
Plug the power cord, as per wiring drawing (§3.4.5)
-
Close the cover
3.5.3
Plugging
The connecting box has to be connected
30mA - 230V - 16A.
THE UNIT HAS TO BE
UTILISATION
WINESP40DUPRO
Page 12
THE PIPE CONNECTION HAS TO BE UNDERTAKEN BY A PROF
gas (nitrogen). Connect the 2 units by a copper line 1/4" for the la
line. The nuts are provided. Put them on the copper rigid pipe before
maximum elevation is 10 meters. The number of bends
Gas loading (R404A)
900 g
1000 g
1100 g
1200 g
before disconnecting the pipes, unscrew fully the valves
replace the gaps on the valves.
Connection of outside unit
Unscrew and remove the cover from outside unit
Unscrew the cover from the waterproof box
Connect the box and the outside unit via the 4G1.5 cord (not supplied)
Connection of inside unit
Unscrew and remove the front cover
Plug the power cord, as per wiring drawing (§3.4.5)
The connecting box has to be connected to a single phase power line protected by a circuit breaker
THE UNIT HAS TO BE INSTALLED RESPECTING THE NATIONAL RULES OF ELECTRIC
INSTALLATIONS.
UNDERTAKEN BY A PROFESSIONNAL.
gas (nitrogen). Connect the 2 units by a copper line 1/4" for the la
line. The nuts are provided. Put them on the copper rigid pipe before
The number of bends per link
, unscrew fully the valves.
) as per wiring drawing
to a single phase power line protected by a circuit breaker
INSTALLED RESPECTING THE NATIONAL RULES OF ELECTRIC