![WINEL Musketeer Hatch Installation, Operation & Maintenance Manual Download Page 11](http://html1.mh-extra.com/html/winel/musketeer-hatch/musketeer-hatch_installation-operation-and-maintenance-manual_986506011.webp)
• Remove the bands that hold the product to the pallet.
• Make sure that the hatch is secured in the closed position. This prevents that the
hatch moves during the lifting operation.
• Use at least two steadying lines to guide the product during the lifting operation.
4.3
Storage
4.3.1
Warehouse storage
• Store the parts in a safe, dry and dust free environment.
This prevents unnecessary damage and wear of the parts.
• If the parts were unpacked from their transport packing, repack the parts using
appropriate packing materials.
• Use the original WINEL BV pallet to store the product.
• Do NOT stack pallets with the products on top of each other.
4.3.2
On-board storage
• Store the parts as close as possible to the future position.
• Make sure to place the hatch assembly on the correct deck.
• Make sure to protect the parts from damage caused by work in the vicinity of the parts.
• Re-pack or cover the hatch assembly and the other parts in order to prevent damage
by grinding or welding nearby.
4.4
Welding
4.4.1
General welding recommendations
Danger:
• Welding the frame into or against the structure must be done by a certified
and qualified welder and according to the requirements of the shipyard and
the applicable class society.
• WINEL BV cannot be held responsible if the welding recommendation and
the advised welding procedures were not followed.
WINEL BV can only make welding recommendations with respect to the product, not with
respect to the construction of the vessel to which the product is installed.
4.4.2
Welding instruction
Caution:
If you do not obey these instructions, you may cause damage to the product
and the watertightness of the product is not guaranteed.
Caution:
Keep both hatch and frame straight. Do not force it towards the deck. Do not
force the frame, for example with clamp tools.
Max frame deflection: 1mm / mtr
Installation
22 - 001 - 15.01.2021
11
Summary of Contents for Musketeer Hatch