2
Table of Contents
Receiving, Inspecting and Unpacking
................................................................................................ 5
Duct Collar and Panel Adjustment
............................................................................................ 23
Installing The Condensing Unit
Installation of Interconnecting Refrigerant Lines
.................................................................. 25
Sample line Set Configurations
Leak Checking and Evacuation Process
................................................................................. 27
Charging System with Head Pressure Control
...................................................................... 29
Summary of Contents for 99H0204-20
Page 12: ...12 Overview of the Evaporator Fig 1...
Page 14: ...14 Overview of the Condenser Fig 2...
Page 15: ...15 Refrigeration Illustration Fig 3...
Page 16: ...16 Wiring Diagram for SP25 Fig 4 DS025 Condenser...
Page 18: ...18...
Page 19: ...19 Specifications Wine Guardian Specification Sheet 60Hz models...