24
2.
For the installer
1 x
1 x
1 x
1 x
– Place the control panel on the boiler (Fig. 45). open the control panel cover and attach on the inside with 4 self-tap-
ping screws and 1 saw tooth ring for the earth – Fig. 46.
Fig. 45 Placing the control panel on the boiler
Fig. 46 Attaching the control panel