![Winco Inverness 24-Hour Treatment Recliner Owner'S Operating And Maintenance Manual Download Page 6](http://html1.mh-extra.com/html/winco/inverness-24-hour-treatment-recliner/inverness-24-hour-treatment-recliner_owners-operating-and-maintenance-manual_984769006.webp)
IMPORTANT: PLEASE READ
For Heat & Heat and Massage Chairs:
This equipment is marked with the industry recognized symbol indicating it is a “Class II
Double-Insulated” device as defined by IEC 60601-1. As such, it does NOT require a three
conductor power cord (i.e. one with a ground connection) for safety purposes. While the
equipment can be safely operated with no ground connection, a three conductor power
cord is provided to satisfy customer expectations for typical equipment configuration.
Devices qualifying as double insulated require different testing & examination procedures than “Class
I Grounded” devices. If your facility requires the product to be tested, be sure to follow testing &
examination procedures for “Class II Double-Insulated” devices
ISOLATION DIAGRAM FOR HEAT & MASSAGE SYSTEM
Area
Insulation Type
A
Basic Operational
B
Double Insulated / Reinforced
C
Double Insulated / Reinforced
D
Double Insulated / Reinforced
E
Double Insulated / Reinforced
F
Double Insulated / Reinforced
G
Inlet FE Pin only connects to inlet & pad
Page 6 of 32
Document No.: 006335
Revision: K
OWNERS OPERATING & MAINTENANCE MANUAL
INVERNESS 24-HOUR TREATMENT RECLINER™