2
OPM-137/D
TABLE OF CONTENTS
SAVE THESE INSTRUCTIONS
2
SAFETY 3
SPECIFICATIONS 4
50PTOC4-03/1
50PTOT4-03/1
50PTOC4-04/1
50PTOT4-04/1
50PTOC4-17/1
50PTOT4-17/1
55PTOC4-18/1
55PTOT4-18/1
INTRODUCTION 5
TESTING POLICY
PREPARING THE UNIT
6
UNPACKING
INSTALLATION 7
FOUNDATION MOUNTING
TRAILER MOUNTING
THREE-POINT HITCH KIT
ELECTRICAL CONNECTIONS
8
GROUNDING
PLUG KIT
Typical Connection Methods for Generator Power Service
OPERATION 11
PRE-START CHECKS
12
GENERATOR PROCEDURES
13
START-UP
SHUTDOWN
MAINTENANCE 14
GENERAL INFORMATION
PERIODICAL MAINTENANCE
LUBRICATION
CLEANING & INSPECTION
GENERATOR STORAGE
TROUBLE SHOOTING TABLE
16
WIRING DIAGRAM
17
120/240V SINGLE PHASE
120/208V & 120/240V THREE PHASE
277/480V THREE PHASE
36 MONTH LIMITED WARRANTY 20
LIMITED WARRANTY
20
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should
be followed during installation and maintenance of the
generator. Read and understand all instructions in the
manual before starting and operating the generator.
USING THIS MANUAL
Congratulations on your choice of a WINCO generator.
You have selected a high-quality, precision-engineered
generator designed and tested to give you years of
satisfactory service.
To get the best performance from your new generator, it is
important that you carefully read and follow the operating
instructions in this manual.
Should you experience a problem please follow the
“Troubleshooting Tables” near the end of this manual.
The warranty listed in the manual describes what you can
expect from WINCO should you need service assistance in
the future.