Wilson Sporting Goods, Inc.
1. Preassemble the pole
anchor system as shown.
The bottom nuts should be
threaded all the way onto the
bolts.
2. Finger tighten all nuts.
3
4
STEPS 4 THROUGH 8
SHOULD BE COMPLETED
AS QUICKLY AS
POSSIBLE DUE TO THE
CURING SPEED OF THE
CONCRETE. PLEASE READ
AHEAD AND UNDERSTAND
THESE STEPS BEFORE
MIXING THE CONCRETE.
1. Mix concrete according
to the manufacturer’s
recommendations.
2. Fill the hole up to a level
18” below the playing surface.
3.
Immediately
proceed to
next step.
3
18”
X 4
X 1
X 8