background image

English

20

WILO SE 04/2015

8.1

General preparation and checking

The balancing valve (pos. 9) controls the differential pressure and 
adjusts the opening cross-section to maintain the flow at the preset 
value. The values given in the table below are set in the factory.

• Before switching on the system for the first time, check if the wiring 

has been performed correctly onsite, particularly the earthing.

• Check if the pipe connections are stress-free.

8.2

Filling, ventilation

CAUTION! Damage to the pump!
Dry running will destroy the circulation pump.

• Make sure that the pump does not run dry.
• Close the quarter-turn flush valve (pos. 6) and the air vent valve 

(pos. 11).

• Open the ventilation shut-off valve (pos. 8).
• Open the valves on the system inlet (pos. 15 and 18) for filling with 

water.

• After it has been completely filled, open the system outlet valve 

(pos. 17).

• Fill up the system.
• Check the tightness of the threaded connections.

8.3

Starting the installation

• After all preparations and checks according to section 8.1 “General 

preparation and checking” on page 20 have been made, switch on the 
main switch.

CAUTION! Damage to the pump!
Danger of damage due to incorrect handling. 

• Do not let the pump operate with a closed pressure valve on deliv-

ery side for more than one minute.

The operating flow is adjusted automatically by the dynamic balanc-
ing valve (pos. 9).

• Place the polar magnetic elements (pos. 4) along the guide supports 

on the separator housing.

9

Maintenance

The separator of the SiClean is static. It has no moving parts, thus it 
does not require special servicing.

We recommend strict compliance with the installation and operating 
instructions of the pump and the switchbox.

9.1

Emptying

In addition, we recommend flushing the system once a day for the 
first 15 days after commissioning, once or twice a week thereafter.

DANGER! Risk of burns when body parts come into contact with 
the pump!
Depending on the pump or system operating conditions (fluid tem-
perature), the entire system can become very hot.

• Keep a safe distance during operation! 

SiClean...

Cartidge colour

Cartidge setting

SiClean 0,5

Grey

5

SiClean 1

Red

5

SiClean 2

Black

8

SiClean 3

White

3

SiClean 4

White

4

SiClean 5

Red

7

Summary of Contents for SiClean 1

Page 1: ...lean Pioneering for You 4 192 808 Ed 01 2015 04 Wilo de Einbau und Betriebsanleitung en Installation and operating instructions fr Notice de montage et de mise en service nl Inbouw en bedieningsvoorsc...

Page 2: ...Fig 1 13 4 13 13 5 5 14 14 14 9 15 12 13 13 3 6 10 1 7 8 14 A 11 16 12 2 13 Fig 2 1 18 8 17 11 4 15 6 230V...

Page 3: ...use 15 3 Transport and interim storage 15 3 1 Transport for installation removal purposes 17 4 Intended use 15 5 Product information 16 5 1 Type key 16 5 2 Technical data 16 5 3 Scope of delivery 16 6...

Page 4: ...he product personnel are not observed this declaration loses its validity 2 Safety These operating instructions contain basic information which must be adhered to during installation operation and mai...

Page 5: ...gether with any internal working operating and safety regulations of the operator are to be complied with 2 5 Safety instructions for the operator This appliance is not intended for use by persons inc...

Page 6: ...arding agent must be taken within the specified period Before installation the product must be kept dry frost free and pro tected from mechanical damage CAUTION Risk of property damage Improper transp...

Page 7: ...equipped with an automatic air vent pos 7 in the upper part to the outlet of the separator This installation and operating instructions describe the complete installation of the SiClean Circulation p...

Page 8: ...ons can result in fatal injury Have the electrical connections established by approved electri cians only in compliance with the applicable regulations Observe the accident prevention regulations CAUT...

Page 9: ...stments and servicing interpose valves on the suction and discharge lines The sludge evacuation pipe must have a full disconnection to outfall at atmospheric pressure The diameter of this pipe must be...

Page 10: ...to section 8 1 General preparation and checking on page 20 have been made switch on the main switch CAUTION Damage to the pump Danger of damage due to incorrect handling Do not let the pump operate wi...

Page 11: ...letely filled open the valve pos 17 down stream of the device Fill up the system Start the circulation pump 10 Faults causes and remedies Safety Maintenance and repair may only be carried out by quali...

Page 12: ...ng of the pump unit Lubricants must be collected The pump components are to be sepa rated according to material metal plastic electronics 1 Use public or private disposal organisations when disposing...

Page 13: ...1 5 1 die Schutzziele der Niederspannungsrichtlinie 2006 95 EG eingehalten werden and accordingto the annex I 1 5 1 comply with the safety objectives of the Low Voltage Directive 2006 95 EC et suivan...

Page 14: ...o ci elektromagnetycznej 2004 108 WE 2004 108 EG pou it harmoniza n normy zejm na stosowanymi normami zharmonizowanymi a w szczeg lno ci viz p edchoz strana patrz poprzednia strona EL TR RO 3 5 7 5 99...

Page 15: ...Hungary Budapest T 36 23 889500 India Pune 411019 T 91 20 27442100 Indonesia Jakarta Timur 13950 T 62 21 7247676 Ireland WILO Ireland T 353 61 227566 Italy Borromeo Milano T 39 25538351 Kazakhstan WI...

Page 16: ...Pioneering for You WILO SE Nortkirchenstra e 100 D 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: