background image

Installation and operating instructions Wilo-RexaLift FIT L

 37

INSTALLATION

 English

• 

The operating space must be clean, dry, well lit 

and free from frost, and furthermore equipped for 
the particular lifting unit.

• 

The operating space must be easily accessible. 

Make sure that there are adequate access oppor-
tunities for the transport equipment including 
lifting unit, and that any elevators required are 

sufficiently large and have an adequate bearing 

capacity.

• Adequate ventilation of the operating space must 

be assured.

• 

The lifting unit must be easily accessible for oper

-

ation and maintenance. A space of at least 60 cm 
must be left clear around the unit (WxHxD).

• 

The installation surface must be solid (suitable for 
accommodating dowels), horizontal and flat.

• 

The placement of any existing or still-to-be 
installed piping (for inlet, pressure and venting) is 

to be checked with regard to connection options 
to the unit.

• A pump sump must be arranged within the op-

erating space for draining it. This must have the 
minimum dimensions of 500x500x500 mm. The 

pump used must be selected according to the 
delivery head of the lifting unit. In an emergen-
cy, it must be possible to drain the pump sump 
manually.

• 

The power supply cables must be designed to 

allow safe operation and installation/dismantling 

without difficulty at all times. Never carry or pull 

the lifting unit by the power supply cable. Check 
whether the cable present is long enough for its 
cross-section and its installation type.

• 

The mounted switchgear/plug are not over

-

flow-proof. Ensure suitable installation.

• Structural components and foundations must 

be sufficiently stable to allow the product to be 
anchored securely and functionally. The operator 

or the supplier is responsible for the provision of 
the foundations and their suitability in terms of 
dimensions, stability and strength.

• 

Check the available planning documentation (in

-

stallation plans, design of operating space, inlet 

conditions) is complete and correct.

• Please also observe the applicable national acci-

dent prevention regulations and trade association 
safety provisions.

• Additionally comply with the following points if 

the lifting unit is installed in a sump:

DANGER of falling! 

The work involved in installing the lifting 

unit and its accessories may require adopting 

a position directly at the edge of the sump. 

Lack of care and/or incorrect choice of cloth-

ing can result in falling. There is a risk of fatal 

injury! Take all necessary safety precautions 

to prevent this.

• Rough solid material must be removed.
• 

The sump must be decontaminated if neces

-

sary.

• 

For safety reasons, make sure a second person 

is present at all times.

• 

Take the necessary countermeasures if there 

is a risk of poisonous or suffocating gases 
collecting!

• Depending on the ambient conditions in opera-

tion, the unit planner must select the sump size 
and motor cooling time accordingly.

• Note the diagonal dimension of the lifting unit.
• It is necessary to guarantee that lifting equip-

ment can be installed without difficulty, since 

this will be required for installing/dismantling 

the lifting unit. The lifting equipment must 

be able to reach the place where the lifting 

unit is used and placed without danger. The 
location must have a firm bearing surface. Two 

transport straps must be used as load-bearing 
equipment for transporting the lifting unit. 

These must be attached to the reservoir. Only 

structurally approved lifting devices may be 
used. Also comply with all regulations, rules 
and laws on working with heavy and suspended 
loads. Wear the necessary physical protection 
equipment.

5.3.1. 

Basic advice on fixing the lifting unit

Lifting units must be installed so they are pre

-

vented from twisting and also in an anti-buoyant 
fashion depending on the installation location. 

For this purpose, the lifting unit must be anchored 
to the floor of the operating space. The lifting 

unit can be installed on various constructions 

(concrete, plastic, etc.). For this reason, the fixa

-

tion materials provided by the customer must be 
suitable for the relevant construction.

Observe the following instructions for the fixation 

material: 

• Ensure the proper edge clearance in order to 

prevent the construction material from tearing or 
chipping.

• 

The size of the borehole depends on the size of 
the bolts. The borehole should be 5 mm deeper 

than the bolt length.

• 

Drilling dust impairs holding strength. Therefore 

always blow or vacuum out the borehole.

• 

Make sure the fixation material is not damaged 

during assembly.

5.3.2.  Stationary dry well installation in buildings and 

sumps

Work steps

The lifting unit is installed in the following steps:

• Positioning the lifting unit and anchoring it to the 

floor

• Connecting the pressure pipe
• Connect main inlet DN 100/DN 150
• Connect the bleed line
• Connect inlet DN 50
• Connect the emergency drain

Summary of Contents for RexaLift FIT L Series

Page 1: ...ice de montage et de mise en service es Instrucciones de instalaci n y funcionamiento it Istruzioni di montaggio uso e manutenzione pt Manual de Instala o e funcionamento tr Montaj ve kullanma k lavuz...

Page 2: ...Fig 2 RexaLift FIT L1 Fig 2 RexaLift FIT L2 Fig 2 Fig 1 RexaLift FIT L1 Fig 1 RexaLift FIT L2 7 1 3 6 5 6 8 4 2 7 1 3 5 6 8 4 4 2 3 2 1 1...

Page 3: ...aLift FIT L2 Fig 4 RexaLift FIT L1 305 85 185 15 185 15 250 180 305 85 185 15 250 180 152 253 305 85 174 15 250 180 250 180 235 235 85 305 15 15 15 164 305 85 243 152 180 250 305 85 15 164 250 180 1 3...

Page 4: ...Fig 7 Fig 6 Fig 5 10 20 mm 1 1 1 1 1 3 2 3 3 4 4 4 5 5 1 2 3 4 1 2 1 2...

Page 5: ...Fig 8 Fig 9 1 3 2 min 25 mm...

Page 6: ......

Page 7: ...es optionally available 35 4 Transport and storage 35 4 1 Delivery 35 4 2 Transport 35 4 3 Storage 35 4 4 Return delivery 36 5 Installation 36 5 1 General 36 5 2 Installation methods 36 5 3 Installati...

Page 8: ...ontains the general information on the warranty Contractual agreements have the highest priority and are not superseded by the information in this section The manufacturer is obliged to correct any de...

Page 9: ...2 General safety The lifting unit must be switched off before any work is performed installation dismantling maintenance installation The lifting unit must be disconnected from the electricity network...

Page 10: ...ing operation The monitoring equipment is connected in the switchgear at the factory Personnel must be informed about the installed systems and how they work CAUTION The lifting unit is not allowed to...

Page 11: ...to EN 12056 1 Explosive fluids Potable water The system must be installed in accordance with the general rules as detailed in EN 12056 and DIN 1986 100 The intended use includes complying with these...

Page 12: ...itchgear and CEE plug including phase inverter Double pump system with switchgear and CEE plug including phase inverter 3 3 Operating principle The sewage that arrives is channelled into the collectio...

Page 13: ...this date cannot be recognised Damage to parts must be noted on the delivery or freight documentation 4 2 Transport Only the appropriate and approved fastening de vices transportation and lifting gear...

Page 14: ...nical sewage systems observe the pertinent local regulations and directives for sewage technology such as those of the German Association for Water Wastewater and Waste In particular pressure surges w...

Page 15: ...directly at the edge of the sump Lack of care and or incorrect choice of cloth ing can result in falling There is a risk of fatal injury Take all necessary safety precautions to prevent this Rough sol...

Page 16: ...oint A gate valve must be installed directly after the pressure connection a non return valve with a ventilation device is integrated in the pressure connection The pressure pipe is then mounted on th...

Page 17: ...bsolutely leak tight A max tightening torque of 5 Nm is permitted when using pipe clamps Fig 6 Installing the DN 70 bleed line 1 DN 50 70 combined connection 2 Saw 1 Open the DN 50 70 combined connect...

Page 18: ...red must be rated accord ing to the starting current Refer to the rating plate for the starting current Only slow blow fuses or K type circuit breakers are allowed to be used as the back up fuse The m...

Page 19: ...he external alarm signal optional Assembling the diaphragm hand pump for emer gency draining System completely cleaned especially of solid matter 6 1 2 Checking the system Complete the following tasks...

Page 20: ...l an addi tional non return valve with a counterweight The pump run time should be determined as follows If a slurping noise can be heard before the pump is switched off pumping a water air mixture bu...

Page 21: ...observe the operating instructions for the diaphragm hand pump 7 Decommissioning disposal All work must be carried out with the greatest care Proper protective clothing is to be worn When working in s...

Page 22: ...office or the supplier from whom you obtained the product 8 Maintenance and repair For reasons of safety and thus to guarantee cor rect function of the lifting unit it must always be maintained by Wil...

Page 23: ...tches back on automatically after the winding has cooled down Frequent switch off by the winding temperature monitoring Wilo customer service 16 Pump ventilation clogged Clean the pump ventilation lin...

Page 24: ...kW Rated current IN 3 7 A 4 5 A 5 4 A 6 3 A 7 A Speed n 2870 rpm 2880 rpm 2850 rpm 2920 rpm 2890 rpm Activation type AT direct direct direct direct direct Protection class unit IP 67 2 mWs 7 d IP 67...

Page 25: ...880 rpm 2850 rpm 2920 rpm 2890 rpm Activation type AT direct direct direct direct direct Protection class unit IP 67 2 mWs 7 D IP 67 2 mWs 7 D IP 67 2 mWs 7 D IP 67 2 mWs 7 D IP 67 2 mWs 7 D Switchgea...

Page 26: ......

Page 27: ......

Page 28: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Reviews: