Brewers With A Cord Set Attached
12 Connect the power cord to the appropriate electrical
outlet.
Connect the Bag-in-Box (BIB) Sweetener -
Units Equipped for Brewing Sweet Tea Only
13 Connect two Bag-in-Box (BIB) sweeteners to the
brewer sweetener supply hoses as instructed in the
OPERATING INSTRUCTIONS
section. Connecting two
bags allows the brewer to continue operating if one
bag runs out.
Power Up the Brewer
14 Turn on the water supply valve.
15 Make sure that the circuit breaker supplying power to
the unit is on.
16 Turn the toggle switch on the back of the brewer to the
0/QPTJUJPO5IFXBUFSUBOLXJMMTUBSUUPmMM8IJMFUIF
UBOLJTmMMJOHJOTQFDUUIFXBUFSTVQQMZMJOFGPSMFBLT
17 When the water in the tank rises to the correct level, the
heating elements will turn on automatically. Depending
on the incoming water temperature and the electrical
TQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZSFRVJSFTUP
minutes to reach the factory set operating temperature.
When the water has heated,
Ready to brew
will be
displayed on the LCD screen.
18 Perform a brew cycle of a least 12 ounces to purge
any remaining air from the system. See
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIF
TPVOETPGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOE
water tank.
INSTALLATION INSTRUCTIONS
II8
DECANTER/DISPENSER BREWERS, INSTALLATION INSTRUCTIONS
080516NC
Connect the Brewer Wiring (cont.)
WARNING:
Connect the power cord to the
appropriate type and size electrical outlet. If the
electrical outlet is not compatible with the power
cord, have it upgraded by a licensed electrician. Do
not modify the power plug. Do not use an extension
cord. Do not use a power cord/plug that is damaged.
IMPORTANT:
When operating the brewer at
higher elevations, reduce the operating
temperature by 2°F for each 1000 feet of
elevation. See
PROGRAMMING GUIDE
.